WAC 468-16-040

WAC 468-16-040. Criteria for a determination of an unsatisfactory record of performance

Last amended: 2025Year: 2026Length: 120 wordsOfficial source
The following list of deficiencies may be considered cause for a determination that an unsatisfactory record of performance exists: (1) Failure to complete project on time; or (2) Continued workmanship below the level of standard; or (3) Failure to adhere to the plans and specifications; or (4) Disregard for the welfare or safety of traveling public; or (5) Inadequate supervision and control of subcontractors; or (6) Insufficient supervision available on project site; or (7) Inadequate coordination and planning with owner; or (8) Inadequate procurement and delivery of supplies and materials; or (9) Inadequate control and utilization of equipment; or (10) An overall performance rating in the performance report of less than standard as defined in WAC 468-16-030 and 468-16-150 .
WAC 468-16-040: WAC 468-16-040. Criteria for a determination of an unsatisfactory record of performance | Justis AI