WAC 480-75-320

WAC 480-75-320. Overpressure protection

Last amended: 2008Year: 2026Length: 49 wordsOfficial source
A pipeline company must conduct a surge analysis to ensure that the surge pressure does not exceed one hundred ten percent of the MOP. The pipeline company must design and operate the pressure relief system consistent with the surge analysis, at or below the MOP except under surge conditions.
WAC 480-75-320: WAC 480-75-320. Overpressure protection | Justis AI