WAC 480-75-530

WAC 480-75-530. Right of way inspections

Last amended: 2008Year: 2026Length: 60 wordsOfficial source
The pipeline company must schedule right of way inspections at least once each calendar week. If weather impedes the ability to conduct a fly-over inspection for a consecutive two week period, the weather condition must be noted and the pipeline company must inspect the right of way inspection by motor vehicle or walking the area, within a two week period.
WAC 480-75-530: WAC 480-75-530. Right of way inspections | Justis AI