C407.2 Mandatory requirements. Compliance with Section C407 also requires compliance with those sections shown in Table C407.2. The building permit application for projects utilizing this method shall include in one submittal all building and mechanical drawings and all information necessary to verify that the building envelope and mechanical design for the project corresponds with the annual energy analysis. If credit is proposed to be taken for lighting energy savings, then an electrical permit application shall also be submitted and approved prior to the issuance of the building permit. If credit is proposed to be taken for energy savings from other components, then the corresponding permit application (e.g., plumbing, boiler, etc.) shall also be submitted and approved prior to the building permit application. Otherwise, components of the project that would not be approved as part of a building permit application shall be modeled in the baseline in accordance with ANSI/ASHRAE/IESNA 90.1 Appendix G and in the proposed model in accordance with the requirements of the Washington State Energy Code. Table C407.2 Mandatory Compliance Measures for Total Building Performance Method Section a Title Comments Envelope C401 Thermal envelope certificate C402.2.7 Airspaces C402.5 Air leakage Mechanical C403.1.2 Calculation of heating and cooling loads C403.1.3 Data centers C403.2 System design C403.3.1 Equipment and system sizing C403.3.2 HVAC equipment performance requirements C403.3.3 Hot gas bypass limitation C403.3.4.4 Boiler turndown C403.4.1 Thermostatic controls C403.4.2 Off-hour controls C403.4.7 Combustion heating equipment controls C403.4.8 Group R-1 hotel/motel guestrooms See Section C403.7.4 C403.4.9 Group R-2 and R-3 dwelling units C403.4.10 Group R-2 sleeping units C403.4.11 Direct digital control systems C403.5.5 Economizer fault detection and diagnostics (FDD) C403.7 Ventilation and exhaust systems Except for C403.7.6.2 C403.8 Fan and fan controls C403.9.1.1 Variable flow controls For cooling tower fans ≥ 7.5 hp C403.9.1.2 Limitation on centrifugal fan cooling towers For open cooling towers C403.10 Construction of HVAC elements C403.11 Mechanical systems located outside of the building thermal envelope C403.14 Commissioning Service Water Heating C404 Service water heating Except for C404.2.1 Lighting and Electrical C405 Electrical power and lighting systems Other Requirements C407 Total building performance C408 System commissioning C409 Energy metering C410 Refrigeration requirements C411 b Renewable energy C412 Compressed air systems Section a Title Comments Envelope C401 Thermal envelope certificate C402.2.7 Airspaces C402.5 Air leakage Mechanical C403.1.2 Calculation of heating and cooling loads C403.1.3 Data centers C403.2 System design C403.3.1 Equipment and system sizing C403.3.2 HVAC equipment performance requirements C403.3.3 Hot gas bypass limitation C403.3.4.4 Boiler turndown C403.4.1 Thermostatic controls C403.4.2 Off-hour controls C403.4.7 Combustion heating equipment controls C403.4.8 Group R-1 hotel/motel guestrooms See Section C403.7.4 C403.4.9 Group R-2 and R-3 dwelling units C403.4.10 Group R-2 sleeping units C403.4.11 Direct digital control systems C403.5.5 Economizer fault detection and diagnostics (FDD) C403.7 Ventilation and exhaust systems Except for C403.7.6.2 C403.8 Fan and fan controls C403.9.1.1 Variable flow controls For cooling tower fans ≥ 7.5 hp C403.9.1.2 Limitation on centrifugal fan cooling towers For open cooling towers C403.10 Construction of HVAC elements C403.11 Mechanical systems located outside of the building thermal envelope C403.14 Commissioning Service Water Heating C404 Service water heating Except for C404.2.1 Lighting and Electrical C405 Electrical power and lighting systems Other Requirements C407 Total building performance C408 System commissioning C409 Energy metering C410 Refrigeration requirements C411 b Renewable energy C412 Compressed air systems a Reference to a code section includes all the relative subsections except as indicated in the table. b Compliance with any of these sections includes compliance with any exception to that section. a Reference to a code section includes all the relative subsections except as indicated in the table. b Compliance with any of these sections includes compliance with any exception to that section.
WAC 51-11C-40702: WAC 51-11C-40702. Section C407.2 — Mandatory requirements | Justis AI