WAC 51-11C-40804

WAC 51-11C-40804. Section C408.4 — Controlled receptacle and lighting control system commissioning

Last amended: 2020Year: 2026Length: 169 wordsOfficial source
C408.4 Controlled receptacle and lighting control system commissioning. Controlled receptacles and lighting control systems subject to Section C405 shall be included in the commissioning process required by Section C408.1. The configuration and function of controlled receptacles and lighting control systems required by this code shall be tested and shall comply with Section C408.4.1. EXCEPTION: Lighting control systems are exempt from the commissioning process in buildings where: 1. The total installed lighting load is less than 20 kW; and 2. The lighting load controlled by occupancy sensors or automatic daylighting controls is less than 10 kW. C408.4.1 System testing. Functional performance testing shall demonstrate that occupant sensors, time switches, manual overrides, night sweep-off, daylight responsive control, and controlled receptacles are installed and operate in accordance with approved construction documents. Testing shall include the sequence of operation and be conducted under the following conditions: 1. Normal operation; 2. Redundant or automatic back-up mode; 3. Performance of alarms; and 4. Mode of operation upon a loss of power and restoration of power.
WAC 51-11C-40804: WAC 51-11C-40804. Section C408.4 — Controlled receptacle and lighting control system commissioning | Justis AI