All construction by county forces project cost records shall be kept in the manner prescribed by the BARS manual. Records of quantities shall be kept in a manner consistent with original project estimates. The project records shall contain, but shall not be limited to, the following: (1) Dated authorizing resolution; (2) Vicinity map showing project location and limits; (3) County engineer's estimate; (4) Affidavit of preconstruction publication required by RCW 36.77.070 ; (5) Documentation of start and end of construction dates; (6) Affidavit of post-construction publication showing true and complete project cost as required by RCW 36.77.070 .