WAC 51-50-2702

WAC 51-50-2702. Section 2702 — Emergency and standby power systems

Last amended: 2020Year: 2026Length: 71 wordsOfficial source
2702.1.5 Load duration. Emergency power systems and standby power systems shall be designed to provide the required power for a minimum duration of 8 hours without being refueled or recharged, unless specified otherwise in this code. EXCEPTION: The minimum duration of all required power loads may be reduced to 2 hours for all systems except for fire pumps that require a minimum duration of 8 hours in accordance with NFPA 20.
WAC 51-50-2702: WAC 51-50-2702. Section 2702 — Emergency and standby power systems | Justis AI