WAC 51-51-60103
WAC 51-51-60103. Section AF103 — Requirements
AF103.1 General. The following construction techniques are intended to resist radon entry and prepare the building for post-construction radon mitigation, if necessary (see Figure AF103.1). These techniques are required in high radon potential counties designated in Table AF101(1).