WAC 16-328-060

WAC 16-328-060. Standards and tolerances for inspection of growing foundation, registered, and certified strawberry planting stock

Last amended: 2000Year: 2026Length: 189 wordsOfficial source
(1) The unit of certification is the lot. (2) Any portion of a field not meeting the standards, tolerances and criteria established in this chapter may be marked and removed from consideration for certification if, in the judgment of the department, it does not jeopardize the certification eligibility of the remaining portion of the field. (3) The department will perform at least two visual inspections of each planting prior to harvest and one inspection during or after harvest. (4) Each lot of foundation, registered or certified planting stock may have no more than the percentage of affected plants listed in the table below. TOLERANCES (%) Foundation Registered Certified Factors (all inspections) 1st & 2nd inspections 3rd inspection Visible Symptoms of Virus Diseases 0 0 0 0.5 Nematode 0 0 0 0 Variety Mixture 0 0 0.1 0 All other Diseases (including lethal decline) 0 0.5 2 1 Foundation Registered Certified Factors (all inspections) 1st & 2nd inspections 3rd inspection Visible Symptoms of Virus Diseases 0 0 0 0.5 Nematode 0 0 0 0 Variety Mixture 0 0 0.1 0 All other Diseases (including lethal decline) 0 0.5 2 1
WAC 16-328-060: WAC 16-328-060. Standards and tolerances for inspection of growing foundation, registered, and certified strawberry planting stock | Justis AI