WAC 173-157-110. What types of information will I need to provide as part of my application?

Last amended: 2003Year: 2026Length: 161 wordsOfficial source
Your application for an ASR project must contain, at a minimum: (1) A description (conceptual model) of the hydrogeologic system (see WAC 173-157-120 ) prepared by a hydrogeologist licensed in the state of Washington. (2) A project operation plan (see WAC 173-157-130 ) with a description of the pilot and operational phases of the ASR project prepared by an engineer or geologist licensed in the state of Washington. (3) A description of the legal framework (see WAC 173-157-140 ) for the proposed project. (4) An environmental assessment and analysis (see WAC 173-157-150 ) of any potential adverse conditions or potential impacts to the surrounding ecosystem(s) that might result from the project, along with a plan to mitigate such conditions or impacts. The environmental assessment will establish whether a determination of nonsignificance or an environmental impact statement is required per SEPA regulations. (5) A project mitigation plan (see WAC 173-157-160 ), if required. (6) A project monitoring plan (see WAC 173-157-170 ).
WAC 173-157-110: WAC 173-157-110. What types of information will I need to provide as part of my application? | Justis AI