WAC 173-175-210

WAC 173-175-210. Operation and maintenance plan

Last amended: 1992Year: 2026Length: 100 wordsOfficial source
(1) An operation and maintenance (O&M) plan shall be developed and submitted to the department for review and acceptance. The O&M plan shall outline and summarize how the project is to be operated and how the basic elements of monitoring, inspection and maintenance, as listed in WAC 173-175-500 (1), are to be accomplished. The department may issue an acceptance after determining the O&M plan is substantially complete. (2) Owners are responsible for incorporating the details of the O&M plan into an O&M manual suitable for use by dam operators. Requirements associated with O&M manuals are listed in WAC 173-175-500 .
WAC 173-175-210: WAC 173-175-210. Operation and maintenance plan | Justis AI