WAC 173-175-350

WAC 173-175-350. Authority for construction permit fees

Last amended: 1992Year: 2026Length: 76 wordsOfficial source
It is required by RCW 90.03.470 (9) that fees be collected by the department for the examination of plans and specifications. The fee shall be a minimum of ten dollars or the actual cost. In addition, the department is required by RCW 43.21A.064 (2) to inspect the construction of all dams. It is required by RCW 90.03.470 (8) that fees be collected for the actual cost to the department for inspection including the expense incident thereto.
WAC 173-175-350: WAC 173-175-350. Authority for construction permit fees | Justis AI