WAC 173-182-210

WAC 173-182-210. Contingency plan format requirements

Last amended: 2006Year: 2026Length: 90 wordsOfficial source
(1) Plan holders shall format and maintain plans to maximize their usefulness during a spill. Information shall be readily accessible and plans will contain job aids, diagrams and checklists for maximum utility. (2) Plans shall be divided into a system of numbered, tabbed chapters, sections and annexes/appendices. Each plan shall include a detailed table of contents based on chapter, section, and annex/appendix numbers and titles, as well as tables and figures. (3) Plans shall be formatted to allow replacement of pages with revisions without requiring replacement of the entire plan.
WAC 173-182-210: WAC 173-182-210. Contingency plan format requirements | Justis AI