Wis. Admin. Code NR 341.03

Definitions

Last amended: 2005Year: 2026Length: 384 wordsOfficial source

Cite as Wis. Admin. Code NR § 341.03

Definitions. Definitions. For the purposes of this chapter the following definitions apply: (1) “Agricultural use of land” means planting, growing, cultivating and harvesting of crops for human or livestock consumption, pasturing or yarding of livestock, sod farms and beekeeping. This definition does not include the construction of structures such as barns, manure storage facilities or barnyard runoff control systems. (2) “Department” means the department of natural resources. (3) “Final stabilization” means that all land disturbing construction activities at the grading site have been completed and that a uniform perennial vegetative cover has been established with a density of at least 70% of the cover for the unpaved areas and areas not covered by permanent structures or that employ equivalent permanent stabilization measures. (4) “Grading” means the physical disturbance of the land surface by the addition, removal or redistribution of soil. (5) “Land disturbing construction activity” means any man-made alteration of the land surface resulting in a change in topography or existing vegetative or non-vegetative soil cover that may result in stormwater runoff and lead to increased soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities. (6) “Navigable waterway” means any body of water with a defined bed and bank, which is navigable under the laws of the state. In Wisconsin, a navigable body of water is capable of floating the lightest boat or skiff used for recreation or any other purpose on a regularly recurring basis. (7) “Ordinary high water mark” means the point on the bank or shore up to which the presence and action of water is so continuous as to leave a distinct mark either by erosion, destruction of terrestrial vegetation or other easily recognizable characteristic. (8) “Priority navigable waterway” has the meaning in s. 30.19 (1b) (c) , Stats., and as identified by the department in s. NR 1.07 . (9) “Stabilize” means the process of making a site steadfast or firm, minimizing soil movement by the use of practices such as mulching and seeding, sodding, landscaping, paving, graveling or other appropriate measures. (10) “Total project area” means the area of land disturbing construction activity both within and outside of the defined bank, if it is part of the same project.
Wis. Admin. Code NR 341.03: Definitions | Justis AI