Wis. Admin. Code NR 500.09

Construction inspection

Last amended: 1996Year: 2026Length: 76 wordsOfficial source

Cite as Wis. Admin. Code NR § 500.09

Construction inspection. Construction inspection. The department may require as a condition of a grant of exemption, the approval of a feasibility report, plan of operation, groundwater monitoring plan, closure plan, site investigation report and remedial action options report or a modification to any approval that critical construction steps of a facility, as specified in the approval, be inspected by the department. The applicant shall pay an inspection fee as specified in s. NR 520.04 (5) .
Wis. Admin. Code NR 500.09: Construction inspection | Justis AI