Wis. Admin. Code NR 507.28

Evaluation of groundwater standards exceedances

Last amended: 2022Year: 2026Length: 289 wordsOfficial source

Cite as Wis. Admin. Code NR § 507.28

Evaluation of groundwater standards exceedances. Evaluation of groundwater standards exceedances. The owner or operator shall determine whether a groundwater standard has been attained or exceeded and whether a PAL or ES applies in accordance with this section. (1) Determination of groundwater standard exceedance. The owner or operator shall determine whether a reported value has attained or exceeded a PAL or ES in accordance with s. NR 140.14 . (2) The point of standards application. The point of standards application to determine if a PAL or ES has been attained or exceeded is specified in either s. NR 140.22 (2) or (3) or s. NR 507.15 (3) (L) 4. for a CCR well. The design management zone and waste boundary are defined in s. NR 140.22 (3) . The department may consider an expansion or reduction of the design management zone, excluding CCR wells, in accordance with s. NR 140.22 (3) (b) to (d) . For purposes of evaluating compliance, a groundwater monitoring well located at the property line is a point of standards application for an ES. (3) Demonstration of a false groundwater standard exceedance. The owner or operator may demonstrate, by resampling or other means, that a source other than the solid waste disposal facility caused the contamination or that the sample result attaining or exceeding a groundwater standard is due to an error. The owner or operator shall notify the department of the intent to either begin assessment monitoring or determine that a false exceedance has occurred. The owner or operator shall submit the statement of intent with the notification required in s. NR 507.30 (1) . The owner or operator shall submit the written demonstration of false exceedance with the results of the next routine monitoring.
Wis. Admin. Code NR 507.28: Evaluation of groundwater standards exceedances | Justis AI