Wis. Admin. Code NR 111.25

Timing

Last amended: 2020Year: 2026Length: 200 wordsOfficial source

Cite as Wis. Admin. Code NR § 111.25

Timing. (1) Compliance. The owner or operator of the facility shall comply with the requirements specified in s. NR 111.21 when a WPDES permit containing requirements consistent with this subchapter is issued to the owner or operator of the facility. (2) Permit application. The department shall review materials submitted by the applicant under s. NR 111.41 at the time of the initial permit application and before each permit renewal or reissuance and shall take all of the following actions: (a) After receiving the initial permit application from the owner or operator of the facility, the department shall determine the applicable standards specified in s. NR 111.21 to apply to the new facility. In addition, the department shall review materials to determine compliance with the applicable standards. (b) For each subsequent permit renewal, the department shall review the application materials and monitoring data to determine whether requirements, or additional requirements, for design and construction technologies or operational measures shall be included in the permit. (c) For track II facilities, the department may review the information collection proposal plan required under s. NR 111.41 (19) (b) . The facility may initiate sampling and data collection prior to receiving comment from the department.
Wis. Admin. Code NR 111.25: Timing | Justis AI