CSR 45-44-8

CSR 45-44-8. Disposition of Permits

SupersededLast amended: 2021Length: 259 wordsOfficial source

Cite as W. Va. Code R. § 45-44-8

§45-44-8. Disposition of Permits. 8.1. In the event the ACE Rule is withdrawn by the U.S. EPA or invalidated by a court of competent jurisdiction or legislative action, the Secretary may terminate any permit or section of an existing permit issued pursuant to this rule. HRI Measure < 200 MW < 200 MW 200 – 500 MW 200 – 500 MW > 500 MW > 500 MW HRI Measure Min Max Min Max Min Max Neural Network / Intelligent Sootblowers 0.5 1.4 0.3 1.0 0.3 0.9 Boiler Feed Pumps 0.2 0.5 0.2 0.5 0.2 0.5 Air Heater & Duct Leakage Control 0.1 0.4 0.1 0.4 0.1 0.4 Variable Frequency Drives 0.2 0.9 0.2 1.0 0.2 1.0 Blade Path Upgrade (Steam Turbine) 0.9 2.7 1.0 2.9 1.0 2.9 Redesign / Replace Economizer 0.5 0.9 0.5 1.0 0.5 1.0 Improved Operating and Maintenance (O & M Practices Can range from 0 to > 2.0% depending on the affected steam generating unit’s historical O & M practices. Can range from 0 to > 2.0% depending on the affected steam generating unit’s historical O & M practices. Can range from 0 to > 2.0% depending on the affected steam generating unit’s historical O & M practices. Can range from 0 to > 2.0% depending on the affected steam generating unit’s historical O & M practices. Can range from 0 to > 2.0% depending on the affected steam generating unit’s historical O & M practices. Can range from 0 to > 2.0% depending on the affected steam generating unit’s historical O & M practices.
CSR 45-44-8: CSR 45-44-8. Disposition of Permits | Justis AI