349 NLRB 1052
G.E. Maier Co.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
349 NLRB No. 98
1052
G.E. Maier Company and Ohio and Vicinity Regional
Council of Carpenters, United Brotherhood of
Carpenters and Joiners of America.
Case 9–
CA–42602
May 9, 2007
DECISION AND ORDER
BY CHAIRMAN BATTISTA AND MEMBERS LIEBMAN
AND WALSH
On August 28, 2006, Administrative Law Judge Arthur
J. Amchan issued the attached decision. The Respondent
filed exceptions and a supporting brief. The General
Counsel and Charging Party filed answering briefs.
The National Labor Relations Board has delegated its
authority in this proceeding to a three-member panel.
The Board has considered the decision and the record
in light of the exceptions1 and briefs and has decided to
adopt the judge’s rulings, findings,2 and conclusions and
to adopt the recommended Order.3
The judge found that the Respondent violated Section
8(a)(5) and (1) of the Act by failing to provide the Union
the information requested in its January 5, 2006 letter,
regarding the Respondent’s relationship with two other
companies. The Respondent argues that it never had a
duty to bargain with the Union, and therefore had no
duty to provide the requested information, because James
Fangmeyer acted without authority when, at a jobsite in
Wellston, Ohio, in May 2002, he signed the Union’s
“Acceptance of Agreements.” That document provided
that the Respondent agreed to recognize the Union and to
abide by the Union’s collective-bargaining agreements
with area contractor associations. The judge rejected this
argument, finding, among other things, that Fangmeyer
had apparent authority to bind the Respondent. We
agree.
As the judge explained, the Board will find apparent
authority where there is a “manifestation by the principal
to a third party that creates a reasonable belief that the
principal has authorized the alleged agent to perform the
acts in question.” Pan-Oston Co., 336 NLRB 305–306
1 No exceptions were filed to the judge’s findings: (1) that the Re-
spondent did not timely terminate its obligations to the Union under the
June 1, 2005 collective-bargaining agreement; and (2) that the Union
established the relevance of the information requested in its January 5,
2006 letter to the Respondent.
2 The Respondent has excepted to some of the judge’s credibility
findings. The Board’s established policy is not to overrule an adminis-
trative law judge’s credibility resolutions unless the clear preponder-
ance of all the relevant evidence convinces us that they are incorrect.
Standard Dry Wall Products, 91 NLRB 544 (1950), enfd. 188 F.2d 362
(3d Cir. 1951). We have carefully examined the record and find no
basis for reversing the findings.
3 We shall attach a new notice to conform to the judge’s recom-
mended Order.
(2001). Here, the Respondent had provided Fangmeyer
with business cards identifying him as its “Vice-
President Installations,” and Fangmeyer had given one of
those cards to union organizer Mark Johnson at the
Wellston jobsite. Moreover, the Respondent had author-
ized Fangmeyer to hire workers and to take any other
necessary steps to complete the work at a jobsite, and
Fangmeyer had exercised that authority in hiring an ap-
prentice through the Union at the Wellston jobsite. In
these circumstances, we find that it was reasonable for
the Union to believe that Fangmeyer was authorized to
sign the Acceptance of Agreements on the Respondent’s
behalf. See Horizon Group of New England, 347 NLRB
795, 806 (2006).4
ORDER
The National Labor Relations Board adopts the rec-
ommended Order of the administrative law judge and
orders that the Respondent, G.E. Maier Company, Cin-
cinnati, Ohio, its officers, agents, successors, and assigns
shall take the action set forth in the Order, except that the
attached notice is substituted for that of the administra-
tive law judge.
APPENDIX
NOTICE TO EMPLOYEES
POSTED BY ORDER OF THE
NATIONAL LABOR RELATIONS BOARD
An Agency of the United States Government
The National Labor Relations Board has found that we vio-
lated Federal labor law and has ordered us to post and obey
this notice.
FEDERAL LAW GIVES YOU THE RIGHT TO
Form, join, or assist a union
Choose representatives to bargain with us on
your behalf
Act together with other employees for your bene-
fit and protection
Choose not to engage in any of these protected
activities.
4 While the Respondent’s sole owner, Thomas G. Maier Sr., insisted
that Fangmeyer was not authorized to sign the Acceptance of Agree-
ments, Maier conceded at the hearing that he would not have expected
a third party to understand the purported limits of Fangmeyer’s author-
ity.
As the judge correctly recognized, Maier’s December 28, 2005 letter
to the Union, in which he untimely sought to terminate the parties’
bargaining relationship, contains another important concession. In this
letter, Maier acknowledged that the Respondent had “signed an agree-
ment” with the Union, without any suggestion that Fangmeyer had
exceeded his authority. This concession amounts to an admission on
Maier’s part that Fangmeyer signed the Acceptance of Agreements on
behalf of the Respondent.
G.E. MAIER CO.
1053
WE WILL NOT fail and refuse to bargain in good faith
with the Ohio and Vicinity Regional Council of Carpen-
ters, United Brotherhood of Carpenters and Joiners of
America (the Union) as the exclusive bargaining agent of
our employees in the appropriate bargaining unit by fail-
ing and refusing to furnish the Union with certain re-
quested information, which was and is necessary and
relevant to the Union’s performance of its function as the
exclusive bargaining agent of our unit employees.
WE WILL NOT in any like or related manner interfere
with, restrain, or coerce you in the exercise of the rights
guaranteed you by Section 7 of the Act.
WE WILL furnish to the Union all the information re-
quested in the Union’s letter dated January 5, 2006.
G.E. MAIER COMPANY
Patricia Rossner Fry, Esq., for the General Counsel.
Douglas C. Anspach Jr., Esq. (Taft, Stettinius & Hollister,
LLP), of Dayton, Ohio, for the Respondent.
Fred Seleman, Esq. (Ulmer & Berne LLP), of Cleveland, Ohio,
for the Charging Party.
DECISION
STATEMENT OF THE CASE
ARTHUR J. AMCHAN, Administrative Law Judge. This case
was tried in Cincinnati, Ohio, on June 20, 2006. The Union,
the Ohio and Vicinity Regional Council of Carpenters, filed the
charge in this matter on January 26, 2006, and the General
Counsel issued a complaint on April 12, 2006.
The General Counsel alleges that Respondent, G.E. Maier
Company, violated Section 8(a)(5) and (1) by failing and refus-
ing to provide the Union with information it requested regard-
ing the relationship between Respondent and another employer,
GEMCO. Respondent contends that it had no obligation to
bargain with the Union, including any obligation to provide the
information requested.
On the entire record, including my observation of the de-
meanor of the witnesses, and after considering the briefs filed
by the General Counsel, the Respondent, and the Charging
Party, I make the following
FINDINGS OF FACT
I. JURISDICTION
Respondent, a corporation, distributed and installed play-
ground and gymnasium equipment from its facility in Cincin-
nati, Ohio, at least through mid-2005. It contends that it is no
longer in business and is no longer subject to the Act. While it
is not clear whether this is true, the record establishes within
the calendar year prior to the filing of the charge and complaint,
Respondent installed gymnasium and playground equipment
valued in excess of $50,000 which was shipped from sources
outside the State of Ohio. Therefore, I find that Respondent is
subject to the Board’s jurisdiction and is an employer engaged
in commerce within the meaning of Section 2(2), (6), and (7) of
the Act. American Gypsum Co., 231 NLRB 1291, 1298 (1977);
Benchmark Industries, 269 NLRB 1096, 1097–1098 (1984);
Kranz Heating & Cooling, 328 NLRB 401, 402 (1999).
II. ALLEGED UNFAIR LABOR PRACTICES
Respondent, G.E. Maier, was founded in 1949. Its sole
owner in recent years has been Thomas G. Maier Sr., a son of
the founder. As late as 2005, Respondent distributed play-
ground and gymnasium equipment and such items as bleachers
and scoreboards and has regularly installed this equipment at
jobsites, many of which were schools.
In about 1999 or 2000, Maier established two other compa-
nies, GEMCO (or GEMCO Products) and GEMCO Installa-
tions. These companies are in the same business as Respon-
dent. GEMCO Installations employs four individuals who
install playground and gymnasium equipment. Maier is sole
owner of all three companies. He determines the employment
policies for all three companies. His son, Thomas Maier Jr., is
an officer of Respondent. His son, Christopher Maier, is an
officer of GEMCO.1
The three companies are in the same
building, appear to have the same telephone number, e-mail
address and be otherwise completely intertwined with one an-
other. For example, they have one employee telephone list and
Nancy Absher, assistant treasurer of GEMCO, handles the pay-
roll for all three companies. All three companies use the same
accountant who determines how the GEMCO companies
charge Respondent, and vice versa—assuming there are arms-
length transactions between these companies. Respondent has
apparently done most of its recent work as a subcontractor to
one of the GEMCO companies.
For the last several years, Respondent’s only permanent em-
ployee has been James Fangmeyer, who worked for it for 37
years and has been a member of the Charging Party Union for
many years.2
In 2002, Fangmeyer carried a business card
which identified him as a vice president for installations of both
Respondent and GEMCO. He presented this card to Union
Organizer Mark Johnson on a jobsite in Wellston, Ohio, in May
2002.
Over the past several years, through 2005, Fangmeyer has
been in charge of installing equipment for Respondent at vari-
ous sites. On some of these sites, the general contractor has
been J & H Erectors, a company which is party to a collective-
bargaining agreement between the Union and the Tri-State
Contractors Association. This agreement covers a number of
counties in southern Ohio, as well as several in Kentucky and
West Virginia. While at various jobsites, including those on
which J & H Erectors has been the general contractor, Fang-
meyer has been authorized to take whatever steps need to be
taken to complete the work, including obtaining equipment at
Respondent’s expense and obtaining additional labor when he
needed it.
1 It is unclear in this record how GEMCO Products and GEMCO In-
stallations are differentiated, if in fact, there is any distinction.
2 The General Counsel alleged in its complaint that Fangmeyer was a
supervisor within the meaning of Sec. 2(11) of the Act and an agent
within the meaning of Sec. 2(13). Respondent denied that Fangmeyer
was a supervisor or an agent. The General Counsel has not established
that Fangmeyer was a supervisor, but if it had been successful it would
also have established that Respondent had no permanent employees.
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
1054
On several occasions, when he has been on jobsites at which
J & H Erectors has been the general contractor, during the past
5 years and prior to that, Fangmeyer has called the Charging
Party Union to obtain additional labor.3 Thomas Maier Sr., was
aware that Fangmeyer and other officials of Respondent had
done so, at least on some occasions, such as on a jobsite at
Youngstown State University in 1997. On several occasions
Fangmeyer has signed documents recognizing the Union as the
exclusive bargaining representative of Respondent’s employees
and promising to abide by the terms of various collective-
bargaining agreements.
One of these is the “acceptance of agreements,” General
Counsel Exhibit 12, which Fangmeyer signed on behalf of Re-
spondent on May 8, 2002, on a J & H Erectors jobsite in Wells-
ton, Ohio, south/southeast of Columbus. Respondent was in-
stalling basketball equipment in the Wellston school gymna-
sium. Pursuant to this document, Respondent recognized the
Union as the exclusive bargaining representative for its em-
ployees performing work on all present and future jobs within
the jurisdiction of the Union, promised to abide by the collec-
tive-bargaining agreement between the Union and the Tri-State
Contractors Association and authorized the Tri-State Contrac-
tors Association to be its collective-bargaining representative
with the Union.
This collective-bargaining agreement between the Tri-State
Contractors Association and the Union was effective between
June 1, 2001, and May 31, 2005 (GC Exh. 18). It provided
that, “it is understood that all signatory employers are bound to
future agreements unless a 90 day cancellation notice is submit-
ted to the Union.”
The agreement was renewed with minor
changes and is effective from June 1, 2005, through May 31,
2010 (GC Exh. 17).
On the Wellston site, Fangmeyer and Union Organizer Mark
Johnson agreed that Respondent could hire a union apprentice,
Bill Crabtree. Fangmeyer called Respondent’s office and ob-
tained workmen’s compensation and unemployment insurance
numbers to fill out other documents for the Union. Fangmeyer
discussed with Nancy Absher, at one time the assistant treas-
urer
of Respondent and currently assistant treasurer of
GEMCO, how to fill out the Union’s fringe benefit forms for
Crabtree. Respondent has paid into the Unions’ fringe benefits
funds for a number of employees, who generally worked for it
for several weeks, up through 2005.
Sometime after the Wellston job, in 2002 or 2003, Union
Organizer Mark Johnson encountered a crew installing basket-
ball backboards on a unionized project at the Jackson, Ohio
High School. The foreman identified the crew as working for
GEMCO. Johnson called Chris Maier, Thomas Maier’s son.
Chris Maier expressed dissatisfaction over an experience with
the Union in the Cleveland area. However, he told Johnson that
if the Union would let GEMCO finish the work they were do-
ing, he would send Fangmeyer to the site for a later phase and
that Fangmeyer would contact the Union for help. Pursuant to
this agreement, the Union furnished Respondent with the ser-
vices of one of its apprentices.
3 Two union apprentices worked for Respondent in Portsmouth,
Ohio, sometime after March 22, 2005.
Later in this time period, the same thing occurred on a multi-
gymnasium project for the Waverly, Ohio schools. After a
telephone conversation between Chris Maier and Johnson, non-
union employees were allowed to complete work on one gym
and the Union supplied apprentices for the rest of the project.
Two union apprentices also worked for Respondent on jobs
in Portsmouth, Ohio, in 2005.4 Respondent paid into the Un-
ion’s fringe benefit funds on behalf of these employees. At
some point Chris Maier told Johnson that while Respondent
would operate as an “open shop” in other areas, it would work
with union labor in South Central Ohio.
On December 28, 2005, Thomas Maier sent a letter to the
Union notifying it of Respondent’s intent to terminate its rela-
tionship with the Union (GC Exh. 10). The Union responded
by sending Maier a letter on January 5, 2006, requesting de-
tailed information about Respondent’s relationship with
GEMCO. Respondent has refused to provide such information
which led the Union to file the charge which gave rise to the
General Counsel’s complaint in this matter.
Analysis
Respondent did not timely terminate its relationship with the
Union in December 2005.
Respondent, by signing the “acceptance of agreements” on
May 8, 2002, and similar documents, did not indicate an un-
equivocal intent to be bound by multiemployer bargaining.
Therefore, it could have terminated its relationship with the
Union had it done so within the timeframe provided in the par-
ties’ collective-bargaining agreement. Schaetzel Trucking, Inc.,
250 NLRB 321, 323 (1980); Gordon Electric Co., 123 NLRB
862, 863 (1959).
However, the collective-bargaining agreement that expired
on May 31, 2005, provided that all signatory employers would
be bound to future agreements unless a 90-day written cancella-
tion notice was submitted to the Union.5 It is undisputed that
Respondent did not submit a written cancellation notice to the
Union 90 days prior to the expiration of the agreement.6 The
Board’s holding in Phoenix Air Conditioning, 231 NLRB 341
(1977), mandates the conclusion that unless Respondent gave
such notice within 120 (or 90) days prior to the expiration of
the Union’s agreement with the Tri-State Contractors, it could
not terminate its obligations under the collective-bargaining
agreement that became effective on June 1, 2005.7
Respondent is not excused from an obligation to provide the
requested information by the fact that on paper James Fang-
meyer was its only permanent employee.
Respondent’s principal defense to complaint is that the Act
precludes the Board from directing it to bargain collectively
4 These jobs, on which J & H Erectors was the general contractor,
were worth over a million dollars.
5 The “acceptance of agreements” signed by Fangmeyer appears to
be inconsistent with the collective-bargaining agreement. It requires
120-days notice.
6 Sometime in the summer of 2005, Chris Maier informed the Union
verbally that Respondent no longer wanted any relationship with it.
7 Also see Cowboy Scaffolding, 326 NLRB 1050 (1998); Gary’s
Electrical Service Co., 326 NLRB 1136, 1140 (1998); City Electric,
288 NLRB 443 (1988).
G.E. MAIER CO.
1055
with the Union since it only employed one permanent em-
ployee, James Fangmeyer, since about 1999. If Respondent is
correct, it cannot be required to provide the Union the informa-
tion requested about its relationship with GEMCO in its Janu-
ary 5, 2006 letter.8
Black letter law clearly prevents the Board from ordering an
employer who employs one permanent employee to bargain
collectively. D & B Masonry, 275 NLRB 1403, 1408 (1985),
and Stack Electric, 290 NLRB 575 (1988). However, the fact
that James Fangmeyer was the only employee of G.E. Maier
Company is not the end of the inquiry in this matter. It is ap-
parent that one or more of the GEMCO companies may be an
alter ego or successor employer to Respondent. An employer is
generally obligated to provide information, such as that re-
quested by the Union, so that the Board can determine whether
it is subject to the Board’s jurisdictional standards by virtue of
its relationship to the other companies, whether it employs unit
employees, and whether or not it has an obligation to bargain
with the Union. Jervis B. Webb Co., 302 NLRB 316, 317
(1991); CEC, Inc., 337 NLRB 516, 519 (2002).
James Fangmeyer had both actual and apparent authority to
bind Respondent when he signed documents committing G.E.
Maier to be bound by the collective-bargaining agreement
between the Tri-State Contractors Association and the Union.
An individual is an agent of his employer if he is acting with
apparent authority on behalf of the employer when he makes a
particular statement or takes a particular action. Apparent au-
thority results from a manifestation by the principal to a third
party that creates a reasonable belief that the principal has au-
thorized the alleged agent to perform the acts in question. Ei-
ther the principal must intend to cause the third person to be-
lieve the agent is authorized to act for him, or the principal
should realize that its conduct is likely to create such a belief.,
Pan-Oston Co., 336 NLRB 305 (2001).
I conclude from Union Organizer Mark Johnson’s uncontra-
dicted testimony regarding his conversations with Chris Maier
in late 2002 or 2003, that James Fangmeyer had apparent au-
thority to bind Respondent to the collective-bargaining agree-
ment between the Tri-State Contractors Association and the
Union. On the Jackson, Ohio jobsite, a GEMCO foreman ad-
vised Johnson to call Chris Maier. Chris Maier, who his father
contends is an officer of GEMCO, but apparently not of Re-
spondent, “acknowledged that they . . . signed . . . an agreement
for my area.”
Chris Maier also acknowledged and ratified Fangmeyer’s
agreements with the Union by promising to send Fangmeyer to
work on additional phases on the project and to hire union ap-
prentices to work with him. The same thing occurred on the
Waverly project. At no time did Chris Maier contend that he
had no authority to speak for Respondent or that Fangmeyer did
8 If Respondent is required to provide this information, it should be
ordered to answer the questions insofar as they applied to GEMCO,
GEMCO Products, and GEMCO Installations. There is no indication
that the Union knew of the existence of the latter two entities and any
fair reading of the inquiry would put Respondent on notice that the
Union was asking about any company related to GEMCO that is con-
trolled by Thomas Maier.
not have authority to sign an agreement with the Union.9 Thus,
assuming that Fangmeyer did not have apparent authority to
bind Respondent prior to the Union’s conversations with Chris
Maier, he did so afterwards. Moreover, Respondent, by Chris
Maier, ratified Fangmeyer’s conduct, Williams Services, 302
NLRB 492, 504 (1991).
Additionally, Respondent’s December 28, 2005 letter to the
Union, seeking to terminate its relationship, concedes that G.E.
Maier had signed an agreement with the Union. In that letter,
there is no contention that James Fangmeyer signed such
agreements without authority to do so. Indeed, I infer from the
December 28, 2005 letter and Thomas Maier, Senior’s aware-
ness that Respondent had on a number of occasions employed
apprentices from the union hall, that Fangmeyer had actual
authority to sign the acceptance of agreements with the Union.
The Union has established the relevance of the requested in-
formation to its duties as collective-bargaining representative;
Respondent violated Section 8(a)(5) in failing and refusing to
provide the information requested.
Since this record demonstrates that the Union has a reason-
able objective basis for believing that an alter ego, single em-
ployer, or successorship relationship exists between Respon-
dent and the GEMCO companies, it is entitled to the informa-
tion it requested regarding the relationships between Thomas
Maier’s companies on January 5, 2006. Cannelton Industries,
339 NLRB 996 (2003);10 Contract Flooring Systems, Inc., 344
NLRB 925 (2005); Z-Bro, Inc., 300 NLRB 87, 90 (1990). By
failing and refusing to provide this information, Respondent
violated Section 8(a)(5) and (1) of the Act.
On these findings of fact and conclusions of law and on the
entire record, I issue the following recommended11
9 Indeed, Chris Maier held several meetings between 2003 and 2005
with Union Business Representative Mark Galea in which he led the
Union to reasonably conclude that he spoke for Respondent. R. Br. at
p. 2 concedes that Christopher Maier was at one time an officer and
manager of Respondent.
10 Current Board law does not require the Union to disclose, at the
time of its information request, the facts which cause it to suspect an
alter-ego or single employer relationship exists. The United States
Court of Appeals for the Third Circuit, however, generally does require
the Union to disclose sufficient facts to the employer at the time of any
information request to demonstrate its claim of relevance, Hertz Corp.
v. NLRB, 105 F. 3d 868 (3d Cir. 1997). However, the Court made clear
that a union does not have to communicate the facts justifying its re-
quest in situations where the employer already is aware of such facts:
In some situations, a union’s reasons for suspecting that dis-
crimination is occurring will be readily apparent. When it is clear
that the employer should have known the reason for the union’s
request for information, a specific communication of the facts un-
derlying the request may not be necessary. As the ALJ noted in
this case, two of Hertz’s managers testified that credibly that they
had no idea why the Union believed that Hertz’s hiring practices
might be discriminatory until they arrived at the administrative
hearing.
[105 F.3d at 874.]
By contrast, Respondent was well aware that GEMCO or GEMCO
Installation employees were performing work claimed by the Union
within the Union’s jurisdiction.
11 If no exceptions are filed as provided by Sec. 102.46 of the
Board’s Rules and Regulations, the findings, conclusions, and recom-
DECISIONS OF THE NATIONAL LABOR RELATIONS BOARD
1056
ORDER
The Respondent, G. E. Maier Company, Cincinnati, Ohio, its
officers, agents, successors, and assigns, shall
1. Cease and desist from
(a) Failing and refusing to bargain in good faith with the
Ohio and Vicinity Regional Council of Carpenters, United
Brotherhood of Carpenters and Joiners of America as the exclu-
sive bargaining agent of its employees in the appropriate bar-
gaining unit by failing and refusing to furnish the Union with
certain requested information which was and is necessary and
relevant to the Union’s performance of its function as the ex-
clusive bargaining agent of the unit employees.
(b) In any like or related manner interfering with, restraining,
or coercing its employees in the exercise of the rights guaran-
teed them in Section 7 of the National Labor Relations Act.
2. Take the following affirmative action necessary to effec-
tuate the policies of the Act.
(a) Furnish the Union all the information requested in the
Union’s letter dated January 5, 2006.
(b) Within 14 days after service by the Region, post at its
Cincinnati, Ohio facility, copies of the attached notice marked
mended Order shall, as provided in Sec. 102.48 of the Rules, be
adopted by the Board and all objections to them shall be deemed
waived for all purposes.
“Appendix.”12 Copies of the notice, on forms provided by the
Regional Director for Region 9, after being signed by the Re-
spondent’s authorized representative, shall be posted by the
Respondent and maintained for 60 consecutive days in con-
spicuous places including all places where notices to employees
are customarily posted. Reasonable steps shall be taken by the
Respondent to ensure that the notices are not altered, defaced,
or covered by any other material. In the event that, during the
pendency of these proceedings, the Respondent has gone out of
business or closed the facility involved in these proceedings,
the Respondent shall duplicate and mail, at its own expense, a
copy of the notice to all current employees and former employ-
ees employed by the Respondent at any time since January 5,
2006.
(c) Within 21 days after service by the Region, file with the
Regional Director a sworn certification of a responsible official
on a form provided by the Region attesting to the steps that the
Respondent has taken to comply.
12 If this Order is enforced by a judgment of a United States court of
appeals, the words in the notice reading “Posted by Order of the Na-
tional Labor Relations Board” shall read “Posted Pursuant to a Judg-
ment of the United States Court of Appeals Enforcing an Order of the
National Labor Relations Board.”