Subpart FFFF — Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units
58 sections
58 sections
- 40 C.F.R. § 60.2983What must I include in my State plan?
- 40 C.F.R. § 60.2984Is there an approval process for my State plan?
- 40 C.F.R. § 60.2988Are there any state plan requirements for this subpart that apply instead of the requirements specified in subpart B of this part?
- 40 C.F.R. § 60.2991What incineration units must I address in my state plan?
- 40 C.F.R. § 60.2993Are any combustion units excluded from my state plan?
- 40 C.F.R. § 60.2994Are air curtain incinerators regulated under this subpart?
- 40 C.F.R. § 60.2996What is the purpose of the “model rule” in this subpart?
- 40 C.F.R. § 60.2997How does the model rule relate to the required elements of my State plan?
- 40 C.F.R. § 60.2998What are the principal components of the model rule?
- 40 C.F.R. § 60.3000When must I comply?
- 40 C.F.R. § 60.3001What must I do if I close my OSWI unit and then restart it?
- 40 C.F.R. § 60.3002What must I do if I plan to permanently close my OSWI unit and not restart it?
- 40 C.F.R. § 60.3010What is a waste management plan?
- 40 C.F.R. § 60.3011When must I submit my waste management plan?
- 40 C.F.R. § 60.3012What should I include in my waste management plan?
- 40 C.F.R. § 60.3014What are the operator training and qualification requirements?
- 40 C.F.R. § 60.3015When must the operator training course be completed?
- 40 C.F.R. § 60.3016How do I obtain my operator qualification?
- 40 C.F.R. § 60.3017How do I maintain my operator qualification?
- 40 C.F.R. § 60.3018How do I renew my lapsed operator qualification?
- 40 C.F.R. § 60.3019What site-specific documentation is required?
- 40 C.F.R. § 60.3020What if all the qualified operators are temporarily not accessible?
- 40 C.F.R. § 60.3024What if I do not use a wet scrubber, dry scrubber, electrostatic precipitator, or fabric filter to comply with the emission limitations?
- 40 C.F.R. § 60.3027How do I conduct the initial and annual performance test?
- 40 C.F.R. § 60.3031By what date must I conduct the initial performance test?
- 40 C.F.R. § 60.3035May I conduct performance testing less often?
- 40 C.F.R. § 60.3038What continuous emission monitoring systems must I install?
- 40 C.F.R. § 60.3039How do I make sure my continuous emission monitoring systems are operating correctly?
- 40 C.F.R. § 60.3040What is my schedule for evaluating continuous emission monitoring systems?
- 40 C.F.R. § 60.3041What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
- 40 C.F.R. § 60.3042How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
- 40 C.F.R. § 60.3043What operating parameter monitoring equipment must I install, or what operating parameters must I monitor?
- 40 C.F.R. § 60.3044Is there a minimum amount of operating parameter monitoring data I must obtain?
- 40 C.F.R. § 60.3046What records must I keep?
- 40 C.F.R. § 60.3047Where and in what format must I keep my records?
- 40 C.F.R. § 60.3048What reports must I submit?
- 40 C.F.R. § 60.3049What information must I submit following my initial performance test?
- 40 C.F.R. § 60.3051What information must I include in my annual report?
- 40 C.F.R. § 60.3052What other reports must I submit if I have a deviation?
- 40 C.F.R. § 60.3054What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
- 40 C.F.R. § 60.3055Are there any other notifications or reports that I must submit?
- 40 C.F.R. § 60.3057Can reporting dates be changed?
- 40 C.F.R. § 60.3061What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery?
- 40 C.F.R. § 60.3062What is an air curtain incinerator?
- 40 C.F.R. § 60.3063When must I comply if my air curtain incinerator burns only wood waste, clean lumber, and yard waste?
- 40 C.F.R. § 60.3064What must I do if I close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and then restart it?
- 40 C.F.R. § 60.3065What must I do if I plan to permanently close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not restart it?
- 40 C.F.R. § 60.3066What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
- 40 C.F.R. § 60.3067How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
- 40 C.F.R. § 60.3068What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
- 40 C.F.R. § 60.3076What equations must I use?
- 40 C.F.R. § 60.3078What definitions must I know?
- 40 C.F.R. Table 1 to Subpart FFFF of Part 60Model Rule—Compliance Schedule
- 40 C.F.R. Table 2 to Subpart FFFF of Part 60Model Rule—Emission Limitations for That Apply to OSWI Units With Capacities Greater Than 10 Tons per Day
- 40 C.F.R. Table 2a to Subpart FFFF of Part 60Table 2 a to Subpart FFFF of Part 60—Model Rule—Emission Limitations That Apply to OSWI Units With Capacities Less Than or Equal to 10 Tons per Day On or After [Date To Be Specified in State Plan] a
- 40 C.F.R. Table 3 to Subpart FFFF of Part 60Model Rule—Operating Limits for Incinerators
- 40 C.F.R. Table 4 to Subpart FFFF of Part 60Model Rule—Requirements for Continuous Emission Monitoring Systems (CEMS)
- 40 C.F.R. Table 5 to Subpart FFFF of Part 60Model Rule—Summary of Reporting Requirements