7 C.F.R. § 58.214

General construction, repair and installation.

Last amended: 2016Year: 2026Length: 49 wordsOfficial source

Cite as 7 C.F.R. § 58.214 (2026)

All equipment and utensils necessary to the manufacture of dry milk products, including pasteurizer, timing-pump or device, flow diversion valve and recorder controller, shall meet the same general requirements as outlined in § 58.128 of this subpart. In addition, for certain other equipment the following requirements shall be met.
Cross-references to the CFR
58.128
7 C.F.R. § 58.214: General construction, repair and installation. | Justis AI