21 C.F.R. § 111.60

What are the design requirements for the production and process control system?

Last amended: 2016Year: 2026Length: 80 wordsSubsections: 2Official source

Cite as 21 C.F.R. § 111.60 (2026)

(a) Your production and in-process control system must be designed to ensure that the dietary supplement is manufactured, packaged, labeled, and held in a manner that will ensure the quality of the dietary supplement and that the dietary supplement is packaged and labeled as specified in the master manufacturing record; and (b) The production and in-process control system must include all requirements of subparts E through L of this part and must be reviewed and approved by quality control personnel.
21 C.F.R. § 111.60: What are the design requirements for the production and process control system? | Justis AI