Pub. L. 91-605, tit. I, sec. 129
district of columbia
district of columbia Sec. 129. (a) In the case of the following routes on the Interstate System in the District of Columbia authorized for construction by section 23 of the Federal-aid Highway Act of 1968, the government of the District of Columbia and the Secretary of Transportation shall restudy such projects and report to Congress not later than 12 months after the date of enactment of this subsection their recommendations with respect to such projects, including any alternative routes or plans: (1) East Leg of the Inner Loop, beginning at Bladensburg Road, I–295 (section C4.1 to C6), (2) North Central and Northeast Freeways, I–95 (section C7 to C13) and I–70S (section C1 to C2). (b) The government of the District of Columbia and the Secretary of Transportation shall study the project for the North Leg of the Inner Loop from point A3.3 on I–66 to point C7 on I–95, as designated in the “1968 Estimate of the Cost of Completion of the National System of Interstate and Defense Highways in the District of 84 Stat. 1732Columbia”, and shall report to Congress not later than 12 months after the date of enactment of this subsection their recommendations with respect to such project including any recommended alternative routes or plans.