Pub. L. 93-251, tit. I, sec. 1
Pub. L. 93-251, tit. I, sec. 1
Sec. 1. (a) The Secretary of the Army, acting through the Chief of Engineers, is hereby authorized to undertake the phase I design memorandum stage of advanced engineering and design of the following multi-purpose water resources development projects, substantially in accordance with, and subject to the conditions recommended by the Chief of Engineers in, the reports hereinafter designated. middle atlantic coastal area The project for hurricane-Hood protection at Virginia Beach, Virginia: House Document Numbered 92–365, at an estimated cost of $954,000. james river basin The project for flood protection for the city of Buena Vista on the Maury River, Virginia: House Document Numbered 93–56, at an estimated cost of $665,000. salt river basin The project for Camp Ground Lake on Beech Fork hi the Salt River Basin, Kentucky, for flood protection and other purposes: House Document Numbered 92–374, at an estimated cost of $330,000. pascagoula river basin The project for flood protection and other purposes on Bowie Creek, Mississippi: House Document Numbered 92–359, at an estimated cost of $390,000. pearl river basin The project for flood control and other purposes on the Pearl River, Mississippi: House Document Numbered 92–282, at an estimated cost of $310,000. upper mississippi river basin The project for flood control and other purposes on the Zumbro River at Rochester, Minnesota: Report of the Chief of Engineers dated June 7, 1973, in House Document Numbered 93–156, at an estimated cost of $150,000. lower mississippi river basin The project for Greenville Harbor, Greenville, Mississippi: Senate Document Numbered 93–38, at an estimated cost of $200,000. The project for flood protection for the east bank of the Mississippi River, Warren to Wilkinson Counties, Mississippi (Natchez area): House Document Numbered 93–148, at an estimated cost of $150,000. The project for flood control and other purposes on the east hank of the Mississippi River, Warren to Wilkinson Counties, Mississippi 88 Stat. 13(Vicksburg-Yazoo area): House Document Numbered 93–149, at an estimated cost of $150,000. The project for flood control and other purposes for the Bushley Bayou area of the Red River backwater area, Louisiana: House Document Numbered 93–157, at an estimated cost of $300,000. pee dee river basin The project for flood control and other purposes on Roaring River Reservoir, North Carolina: in accordance with the recommendations of the Secretary of the Army in his report dated April 12, 1971, on the Development of Water Resources in Appalachia, at an estimated cost of $400,000. altamaha river basin The project for flood control and other purposes at Curry Creek Reservoir, Georgia: in accordance with the recommendations of the Secretary of the Army in his report dated April 12, 1971, on the Development of Water Resources in Appalachia, at an estimated cost of $400,000. coosa river basin The project for flood control and other purposes at Dalton Reservoir, Conasauga River, Georgia: in accordance with the recommendations of the Secretary of the Army in his report dated April 12, 1971, on the Development of Water Resources in Appalachia, at an estimated cost of $440,000. guadalupe river basin The project for flood control and other purposes on the Blanco River at Clopton Crossing, Texas: House Document Numbered 92–364, at an estimated cost of $177,000. arkansas river basin The project for flood protection and other purposes on the Arkansas River and tributaries above John Martin Dam, Colorado: House Document Numbered 93–143, at an estimated cost of $1,140,000. spring river basin The project for flood control and other purposes on Center Creek near Joplin, Missouri: House Document Numbered 92–361, at an estimated cost of $150,000. columbia river basin The project for installation of power generating facilities at the Libby Reregulating Dam, Kootenai River, Montana: Senate Document Numbered 93–29, at an estimated cost of $75,000. umpqua river basin The project for flood protection and other purposes at the Days’ Creek Dam, South Umpqua River, Oregon: House Document Numbered 92–371, at an estimated cost of $400,000. (b) The Secretary of the Army is authorized to undertake advanced engineering and design for the projects in subsection (a) of this section after completion of the phase I design memorandum stage of such projects. Such advanced engineering and design may be undertaken only upon a finding by the Chief of Engineers, transmitted to the 88 Stat. 14Committees on Public Works of the Senate and House of Representatives, that the project is without substantial controversy, that it is substantially in accordance with and subject to the conditions recommended for such project in this section, and that the advanced engineering and design will be compatible with any project modifications which may be under consideration. There is authorized to carry out this subsection not to exceed $5,000,000. No funds appropriated under this subsection may be used for land acquisition or commencement of construction.