Pub. L. 93-251, tit. I, sec. 2
Pub. L. 93-251, tit. I, sec. 2
Sec. 2. Sections 201 and 202 and the last three sentences in section 203 of the Flood Control Act of 1968 shall apply to all projects authorized in this section. The following works of improvement for the benefit of navigation anti the control of destructive floodwaters and other purposes are hereby adopted and authorized to be prosecuted by the Secretary of the Army, acting through the Chief of Engineers, in accordance with the plans and subject to the conditions recommended by the Chief of Engineers in the respective reports hereinafter designated. delaware river basin The project for local flood protection on Wabash Creek, Borough of Tamaqua, Pennsylvania: In accordance with the recommendations of the Secretary of the Army in his report dated April 12, 1971, on the Development of Water Resources in Appalachia, at an estimated cost of $2,355,000. charles river watershed The project for flood control and other purposes in the Charles River Watershed, Massachusetts: Report of the Chief of Engineers dated December 6, 1972, at an estimated cost of $7,340,000. upper mississippi river basin The project for flood control and other purposes at Prairie du Chien. Wisconsin: Report of the Chief of Engineers dated February 9, 1972. at an estimated cost of $1,840,000.