Pub. L. 93-251, tit. I, sec. 4

Pub. L. 93-251, tit. I, sec. 4

EnactedYear: 1974Length: 81 wordsOfficial source
Sec. 4. The project for beach erosion control on Ediz Hook at Port Angeles, Washington, is authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 93–101. at an estimated cost of $4,553,000. The Secretary of the Army, acting through the Chief of Engineers is authorized to undertake, in connection with such project, such emergency interim measures as may be necessary to prevent the breaching of Ediz Hook prior to construction of the authorized project.