Pub. L. 93-251, tit. I, sec. 50

Pub. L. 93-251, tit. I, sec. 50

EnactedYear: 1974Length: 102 wordsOfficial source
Sec. 50. The project for Libby Dam (Lake Koocanusa), Montana, authorized by the Flood Control Act approved May 17, 1950 ( 64 Stat. 170), is hereby modified to provide that the Secretary of the Army, acting through the Chief of Engineers, is authorized to reimburse Boundary County, Idaho, for the cost incurred to elevate, relocate, or reconstruct the bridge, located at the mouth of Deep Creek as it joins the Kootenai River, made necessary by the duration of higher flows during drawdown operations at Libby Dam. There is authorized to be appropriated not to exceed $350,000 for the purposes of this section.
Pub. L. 93-251, tit. I, sec. 50 | Justis AI