Sec. 310. The Administrator shall, as soon as practicable and consistent with design, economic, and feasibility studies, include in an annual authorization proposal a recommendation on construction of at least one demonstration offshore wind-electric generating facility.
Pub. L. 94-187, tit. III, pt. B, sec. 310 | Justis AI