Pub. L. 104-303, tit. III, sec. 312
THAMES RIVER, CONNECTICUT.
SEC. 312. THAMES RIVER, CONNECTICUT.(a) Modification.—The project for navigation, Thames River, Connecticut, authorized by the 1st section of the Act entitled “An Act authorizing the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved August 30, 1935 (49 Stat. 1029), is modified to reconfigure the turning basin in accordance with the following alignment: Beginning at a point on the eastern limit of the existing project, N251052.93, E783934.59, thence running north 5 degrees, 25 minutes, 21.3 seconds east 341.06 feet to a point, N251392.46, E783966.82, thence running north 47 degrees, 24 minutes, 14.0 seconds west 268.72 feet to a point, N251574.34, E783769.00, thence running north 88 degrees, 41 minutes, 52.2 seconds west 249.06110 STAT. 3714 feet to a point, N251580.00, E783520.00, thence running south 46 degrees, 16 minutes, 22.9 seconds west 318.28 feet to a point, N251360.00, E783290.00, thence running south 19 degrees, 1 minute, 32.2 seconds east 306.76 feet to a point, N251070.00, E783390.00, thence running south 45 degrees, 0 minutes, 0 seconds, east 155.56 feet to a point, N250960.00, E783500.00 on the existing western limit. (b) Payment for Initial Dredging.—Any required initial dredging of the widened portions identified in subsection (a) shall be carried out at no cost to the Federal Government. (c) Deauthorization.—The portions of the turning basin that are not included in the reconfigured turning basin described in subsection (a) are not authorized after the date of the enactment of this Act.