Pub. L. 104-303, tit. III, sec. 315

CENTRAL AND SOUTHERN FLORIDA, CANAL 51.

EnactedYear: 1996Length: 136 wordsOfficial source
SEC. 315. CENTRAL AND SOUTHERN FLORIDA, CANAL 51.The project for flood protection of West Palm Beach, Florida (C–51), authorized by section 203 of the Flood Control Act of 1962 (76 Stat. 1183), is modified to provide for the construction of an enlarged stormwater detention area, Storm Water Treatment Area 1 East, generally in accordance with the plan of improvements described in the February 15, 1994, report entitled “Everglades Protection Project, Palm Beach County, Florida, Conceptual Design”, with such modifications as are approved by the Secretary. The additional work authorized by this section shall be accomplished at Federal expense. Operation and maintenance of the stormwater detention area shall be consistent with regulations prescribed by the Secretary for the Central and Southern Florida project, and all costs of such operation and maintenance shall be provided by non-Federal interests.
Pub. L. 104-303, tit. III, sec. 315: CENTRAL AND SOUTHERN FLORIDA, CANAL 51. | Justis AI