Pub. L. 106-53, tit. III, sec. 344

WILLAMETTE RIVER TEMPERATURE CONTROL, MCKENZIE SUBBASIN, OREGON.

EnactedYear: 1999Length: 162 wordsOfficial source
SEC. 344. WILLAMETTE RIVER TEMPERATURE CONTROL, MCKENZIE SUBBASIN, OREGON. (a) In General.—The project for environmental restoration, Willamette River Temperature Control, McKenzie Subbasin, Oregon, authorized by section 101(a)(25) of the Water Resources Development Act of 1996 (110 Stat. 3665), is modified to authorize the Secretary to construct the project substantially in accordance with the Feature Memorandum dated July 31, 1998, at a total cost of $64,741,000, if the Secretary determines that the project as modified is technically sound and environmentally acceptable.113 STAT. 309 (b) Report.—Not later than 90 days after the date of enactment of this Act, the Secretary shall submit to Congress a report that— (1) states the reasons for the increase in the cost of the project; (2) outlines the steps that the Corps of Engineers is taking to control project costs, including the application of value engineering and other appropriate measures; and (3) includes a cost estimate for, and recommendations on the advisability of, adding fish screens to the project.
Pub. L. 106-53, tit. III, sec. 344: WILLAMETTE RIVER TEMPERATURE CONTROL, MCKENZIE SUBBASIN, OREGON. | Justis AI