Pub. L. 109-103, tit. I, sec. 137
Pub. L. 109-103, tit. I, sec. 137
Sec. 137. The Secretary of the Army, acting through the Chief of Engineers, is hereby authorized and directed to design and construct until hereafter completed, the recreation and access features designated as Phase II of the Louisville Waterfront Park, Kentucky, as described in the Louisville Waterfront Park, Phases II and III, Detailed Project Report, by the Louisville District of the Corps of Engineers dated May 2002. The project shall be cost shared 50 percent Federal and 50 percent non-Federal. The cost of project work undertaken by the non-Federal interests, including but not limited to prior planning, design, and construction, shall be credited toward the non-Federal share of project design and construction costs.