Pub. L. 116-283, div. A, tit. VIII, subtit. E, sec. 864 (as amended)

MAXIMUM AWARD PRICE FOR SOLE SOURCE MANUFACTURING CONTRACTS.

Year: 2025Length: 97 wordsOfficial source
SEC. 864. MAXIMUM AWARD PRICE FOR SOLE SOURCE MANUFACTURING CONTRACTS. The Small Business Act (15 U.S.C. 631 et seq.) is amended— (1) in section 8 (15 U.S.C. 637)— (A) in subsection (a)(1)(D)(i)(II), by striking “$5,000,000” and inserting “$7,000,000”; and (B) in subsection (m)— (i) in paragraph (7)(B)(i), by striking “$6,500,000” and inserting “$7,000,000”; and (ii) in paragraph (8)(B)(i), by striking “$6,500,000” and inserting “$7,000,000”; (2) in section 31(c)(2)(A)(ii)(I) (15 U.S.C. 657a(c)(2)(A)(ii)(I)), by striking “$5,000,000” and inserting “$7,000,000”; and (3) [15 U.S.C. 657f] in section 36(c)(2)(A), as so redesignated by section 862(d)(1)(C), by striking “$5,000,000” and inserting “$7,000,000”.
Cross-references to the US Code
15 U.S.C. 657f
Pub. L. 116-283, div. A, tit. VIII, subtit. E, sec. 864 (as amended): MAXIMUM AWARD PRICE FOR SOLE SOURCE MANUFACTURING CONTRACTS. | Justis AI