Pub. L. 116-283, div. A, tit. VIII, subtit. E, sec. 864 (as amended)
MAXIMUM AWARD PRICE FOR SOLE SOURCE MANUFACTURING CONTRACTS.
SEC. 864. MAXIMUM AWARD PRICE FOR SOLE SOURCE MANUFACTURING CONTRACTS.
The Small Business Act (15 U.S.C. 631 et seq.) is amended—
(1) in section 8 (15 U.S.C. 637)—
(A) in subsection (a)(1)(D)(i)(II), by striking “$5,000,000” and inserting “$7,000,000”; and
(B) in subsection (m)—
(i) in paragraph (7)(B)(i), by striking “$6,500,000” and inserting “$7,000,000”; and
(ii) in paragraph (8)(B)(i), by striking “$6,500,000” and inserting “$7,000,000”;
(2) in section 31(c)(2)(A)(ii)(I) (15 U.S.C. 657a(c)(2)(A)(ii)(I)), by striking “$5,000,000” and inserting “$7,000,000”; and
(3) [15 U.S.C. 657f] in section 36(c)(2)(A), as so redesignated by section 862(d)(1)(C), by striking “$5,000,000” and inserting “$7,000,000”.
- Cross-references to the US Code
- 15 U.S.C. 657f