HAR §11-502-10. Operations and maintenance
Length: 863 wordsOfficial source
Cite as Haw. Code R. § 11-502-10
(a) The
local education agency shall implement an operations,
maintenance, and repair program pursuant to this
section whenever any friable ACBM is present or assumed
to be present in a building that it leases, owns, or
otherwise uses as a school building. Any material
identified as nonfriable ACBM or nonfriable assumed
ACBM must be treated as friable ACBM for purposes of
this section when the material is about to become
friable as a result of activities performed in the
school building.
(b)
The protection provided by EPA at 40 CFR
763.121 for worker protection during asbestos abatement
projects is extended to employees of the local
education agency who perform operations, maintenance,
and repair activities involving ACM and who are not
covered by the OSHA asbestos construction standard at
29 CFR 1926.1101 or an asbestos worker approved by OSHA
pursuant to Section 19 of the U.S. Occupational Safety
and Health Act. The local education agency may consult
40 CFR Part 763, Subpart E, Appendix B, as referenced
in section 11-502-3, if their employees are performing
operations, maintenance, and repair activities that are
of small-scale and short duration.
(c)
Small-scale, short duration activities shall
only be performed by staff that have completed the
training required by section 11-502-11. Records of all
small-scale, short duration activities must be kept in
the management plan. These shall include:
(1)
The location of ACBM disturbance;
(2)
The amount of ACBM affected;
(3)
The person performing the activity;
(4)
The training this person has received;
(5)
The length of time required to complete the
activity; and
(6)
If ACM is removed, the name and location of
the storage or disposal site of the ACM.
(d)
Cleaning shall be performed as follows:
(1)
unless the building has been cleaned using
equivalent methods within the previous six
months, all areas of a school building where
friable ACBM, damaged or significantly
damaged thermal system insulation ACM, or
friable suspected ACBM assumed to be ACM are
present shall be cleaned at least once after
the completion of the inspection required by
section 11-502-5(a) and before the initiation
of any response action, other than operations
and maintenance activities or repair,
according to the following procedures:
(A)
HEPA-vacuuming or steam-cleaning all
carpets;
(B)
HEPA-vacuuming or wet-cleaning all other
floors and all other horizontal
surfaces; and
(C)
Disposal of all debris, filters,
mop-heads, and cloths in sealed, leak-
tight containers;
(2)
The certified management planner shall make a
written recommendation to the local education
agency whether additional cleaning is needed,
and if so, the methods and frequency of such
cleaning.
(e)
The local education agency shall ensure that
the procedures described below to protect building
occupants shall be followed for any operations and
maintenance activities disturbing friable ACBM:
(1)
Restrict entry into the area by persons other
than those necessary to perform the
maintenance project, either by physically
isolating the area or by scheduling;
(2)
Post signs to prevent entry by unauthorized
persons;
(3)
Shut off or temporarily modify the air-
handling system and restrict other sources of
air movement;
(4)
Use work practices or other controls, such as
wet methods, protective clothing, HEPA-
vacuums, mini-enclosures, glove bags, as
necessary to inhibit the spread of any
released fibers;
(5)
Clean all fixtures or other components in the
immediate work area; and
(6)
Place the asbestos debris and other cleaning
materials in a sealed, leak-tight container.
(f)
The response action for any maintenance
activities disturbing friable ACBM, other than small-
scale, short duration maintenance activities, shall be
designed by persons certified to design response
actions and conducted by persons certified to conduct
response actions as required by sections 11-504-22, 11-
504-23, and 11-504-35.
(g)
The local education agency shall ensure that
the procedures described below are followed in the
event of a minor fiber release episode; these
procedures may be conducted by persons trained pursuant
to subsection 11-502-11(b):
(1)
The debris shall be thoroughly saturated
using wet methods;
(2)
The area shall be cleaned, as described in
subsection (d);
(3)
The asbestos debris shall be placed in a
sealed, leak-tight container; and
(4)
The area of damaged ACM shall be repaired
with materials such as asbestos-free
spackling, plaster, cement, or insulation;
sealed with latex paint or an encapsulant; or
the appropriate response action required by
section 11-502-9 shall be immediately
implemented.
(h)
The local education agency shall ensure that
the procedures described below are followed in the
event of a major fiber release episode:
(1)
Entry into the area shall be restricted and
signs shall be posted to prevent entry into
the area by persons other than those
necessary to perform the response action;
(2)
The air-handling system shall be shut off or
temporarily modified to prevent the
distribution of fibers to other areas in the
building; and
(3)
The response action for any major fiber
release episode shall be designed by persons
certified to design response actions and
conducted by persons certified to conduct
response actions as required by sections 11-
504-22, 11-504-23, and 11-504-35.
(i)
The local education agency shall ensure that
ACM such as floor tiles are not subjected to dry
stripping or dry sanding. [Eff ] (Auth:
HRS §321-11(26)) (Imp: 40 CFR Part 763.91)