HAR §11-502-9
HAR §11-502-9. Response actions
Length: 1,557 wordsOfficial source
Cite as Haw. Code R. § 11-502-9
(a) The local
education agency shall select and implement in a timely
manner the appropriate response actions in this section
consistent with the assessment conducted pursuant to
section 11-502-8. The response actions selected shall
be sufficient to protect human health and the
environment. The local education agency may then
select, from the response actions which protect human
health and the environment, that action which is the
least burdensome method. Nothing in this section shall
be construed to prohibit removal of ACBM from a school
building at any time, should removal be the preferred
response action of the local education agency.
(b)
If damaged or significantly damaged thermal
system insulation ACM is present in a building, the
local education agency shall:
(1)
Repair the damaged area;
(2)
Remove the damaged material if it is not
feasible, due to technological factors, to
repair the damage; or
(3)
Maintain all thermal system insulation ACM
and its covering in an intact state and
undamaged condition.
(c)
If damaged friable surfacing ACM or damaged
friable miscellaneous ACM is present in a building, the
local education agency shall select from among the
following response actions: encapsulation, enclosure,
removal, or repair of the damaged material. In
selecting the response action from among those which
meet the definitional standards of a response action as
provided in section 11-502-2, the local education
agency shall determine which of these response actions
protects human health and the environment. For
purposes of determining which of these response actions
are the least burdensome, the local education agency
may then consider local circumstances, including
occupancy and use patterns within the school building,
and its economic concerns, including short-term and
long-term costs.
(d)
If significantly damaged friable surfacing
ACM or significantly damaged friable miscellaneous ACM
is present in a building, the local education agency
shall:
(1)
Immediately isolate the functional space and
restrict access, unless isolation is not
necessary to protect human health and the
environment; and
(2)
Remove the material in the functional space;
or enclose or encapsulate if these would be
sufficient to protect human health and the
environment.
(e)
If any friable surfacing ACM, thermal system
insulation ACM, or friable miscellaneous ACM that has
potential for damage is present in a building, the
local education agency shall at a minimum implement an
operations and maintenance program, as described in
section 11-502-10.
(f)
If any friable surfacing ACM, thermal system
insulation ACM, or friable miscellaneous ACM that has
potential for significant damage is present in a
building, the local education agency shall:
(1)
Implement an operations and management
program as described in section 11-502-10;
(2)
Institute preventive measures appropriate to
eliminate the reasonable likelihood that the
ACM or its covering will become significantly
damaged, deteriorated, or delaminated;
(3)
Remove the material as soon as possible if
appropriate preventive measures cannot be
effectively implemented, or unless other
response actions are determined to protect
human health and the environment; immediately
isolate the area and restrict access if
necessary to avoid an imminent and
substantial endangerment to human health or
the environment.
(g)
Response actions including removal,
encapsulation, enclosure, or repair, other than small-
scale, short duration repairs, shall be designed and
conducted by persons certified to design and conduct
response actions as required in chapter 11-504, and in
accordance with chapter 11-501. All certification
records must be kept by the contractors and also kept
in the management plan. These records must be made
available for inspection by the department of health.
Small-scale, short duration response actions shall be
designed and conducted by personnel who have at the
minimum completed the training required by section 11-
502-11. Records of all small-scale, short duration
response actions must be kept in the management plan
pursuant to section 11-502-13(c).
(h)
The requirements of this chapter in no way
supersede the worker protection and work practice
requirements pursuant to 29 CFR 1926.1101 (Occupational
Safety and Health Administration asbestos worker
protection standards for construction), and chapter 11-
501 (Asbestos Requirements).
(i)
At the conclusion of any action to remove,
repair, encapsulate, or enclose ACBM or material
assumed to be ACBM and before re-occupancy:
(1)
After the requirements of paragraphs (2)
through (7) have been completed, a person
designated by the local education agency who
is certified as a project monitor pursuant to
section 11-504-36 shall visually inspect each
functional space where the action was
conducted to determine whether the action has
been properly completed. This visual
inspection shall determine if any ACBM dust
or debris is present. The person designated
to conduct the visual inspection, the date,
the area inspected, the response action
conducted, and the results of the visual
inspection shall be written and included in
the management plan with all other documents
relating to this response action. If any
debris or dust is found, the response action
shall not be considered complete;
(2)
A person designated by the local education
agency who is certified as a project monitor
pursuant to section 11-504-36 shall collect
air samples using aggressive sampling as
described in 40 CFR Part 763, Subpart E,
Appendix A, as referenced in section 11-502-
3, to monitor air for clearance after each
removal, encapsulation, and enclosure project
involving ACBM, except for projects that are
of small-scale, short duration or contained
non-friable ACM that did not become friable
during or after the response action. Air
sample results must be provided in writing to
the designated person before re-occupancy.
The location of where these samples were
taken must be recorded and kept in the
management plan;
(3)
The local education agency shall have air
samples collected pursuant to this section
analyzed for asbestos using laboratories
registered with the department, as required
in section 11-504-19, and accredited by the
NVLAP to conduct such analyses using
transmission electron microscopy or, under
circumstances permitted in this section,
laboratories enrolled in an American
Industrial Hygiene Association Testing
Program for phase contrast microscopy;
(4)
Except as provided in paragraph (5) and (6)
an action to remove, encapsulate, or enclose
ACBM shall be considered complete when the
average concentration of asbestos of five air
samples collected within the affected
functional space and analyzed by the
transmission electron microscopy method in 40
CFR Part 763, Subpart E, Appendix A, as
referenced in section 11-502-3, is not
statistically different, as determined by the
Z-test calculation found in 40 CFR Part 763,
Subpart E, Appendix A, as referenced in
section 11-502-3, from the average asbestos
concentration of five air samples collected
at the same time outside the affected
functional space and analyzed in the same
manner, and the average asbestos
concentration of the three field blanks
described in 40 CFR Part 763, Subpart E,
Appendix A, is below the filter background
level, as defined 40 CFR Part 763, Subpart E,
Appendix A, of seventy structures per square
millimeter;
(5)
An action may also be considered complete if
the volume of air drawn for each of the five
samples collected within the affected
functional space is equal to or greater than
1,199 liters of air for a twenty-five
millimeter filter or equal to or greater than
2,799 liters of air for a thirty-seven
millimeter filter, and the average
concentration of asbestos as analyzed by the
transmission electron microscopy method in 40
CFR Part 763, Subpart E, Appendix A, as
referenced in section 11-502-3, for the five
air samples does not exceed the filter
background level, as defined in 40 CFR Part
763, Subpart E, Appendix A, of seventy
structures per square millimeter. If the
average concentration of asbestos of the five
air samples within the affected functional
space exceeds seventy structures per square
millimeter, or if the volume of air in each
of the samples is less than 1,199 liters of
air for a twenty-five millimeter filter or
less than 2,799 liters of air for a thirty-
seven millimeter filter, the action shall be
considered complete only when the
requirements of paragraph (4) or (6) are met;
(6)
The local education agency may choose to
analyze air monitoring samples collected for
clearance purposes by phase contrast
microscopy, rather than transmission electron
microscopy, to confirm completion of removal,
repair, encapsulation, or enclosure of ACBM
that is of small-scale, short duration. The
action shall be considered complete when the
results of samples collected in the affected
functional space and analyzed by phase
contrast microscopy using the NIOSH Method
7400 entitled "Fibers" published in the NIOSH
Manual of Analytical Methods, 3rd Edition,
Second Supplement, August 1987, show that the
concentration of fibers for each of the five
samples is less than or equal to a limit of
quantification for phase contrast microscopy
(0.01 fibers per cubic centimeter of air);
and
(7)
To determine the amount of ACBM affected
pursuant to paragraph (6), the local
education agency shall add the total square
or linear footage of ACBM within the
containment barriers used to isolate the
functional space for the action to remove,
repair, encapsulate, or enclose the ACBM.
Contiguous portions of material subject to
such action conducted concurrently or at
approximately the same time within the same
school building shall not be separated to
qualify pursuant to paragraph (6). The
division of a pre-existing functional space
into smaller functional spaces through
containments or other methods to reduce the
amount of ACBM and avoid more stringent air-
clearance requirements is not permitted.
[Eff ] (Auth: HRS §321-11(26))
(Imp: 40 CFR Part 763.90)