HAR §11-58.1-41
HAR §11-58.1-41. waste), and other solid wastes
Cite as Haw. Code R. § 11-58.1-41
(A)
Exemption.
Composting facilities processing less than
three thousand tons of green wastes (yatd wastes) per
year are permitted by rule.
(b)
Permit requirements:
(1)
Site analysis.
A site analysis shall be submitted and
shall include at least a site plan, description of the
siting of equipment and machinery, public access, and
turnaround areas.
The site analysis shall include
surrounding land uses and, where determined necessary
by the director, describe mitigative measures taken to
reduce the impact of the facility upon neighboring
properties.
(2)
Design requirements.
(A)
Provide engineering plans and specifications for
the entire composting facility, including
manufacturer's performance data for the selected
equipment.
(B)
The composting facility must have sufficient
temperature monitoring to ensure that the pathogen
reduction criteria are met.
For a·windrow and an
aerated static pile process, this may include
monitoring six to eight inches below the pile
surface and for an aerated static pile process,
six to eight inches from the outlet of the
aeration pipe.
For an enclosed vessel system,
this may include monitoring six to eight inches
inside the vessel wall and six to eight inches
from the aeration piping (when operating in the
positive aeration mode).
Temperature monitoring
must occur, at a minimum, on a daily basis.
(C)
Nuisance, health, and safety control.
Design
methods to control litter, insects, odors, and
vectors.
Develop a fire plan to prevent and
minimize fire hazards.
The transfer station shall
maintain a neat and orderly appearance and must be
screened and buffered to minimize nuisances to
neighboring properties.
(D)
The waste storage area and the active composting,
curing, and compost storage areas must be located
on surfaces capable of minimizing leachate release
58.1-94
1711
§11-58.1-41
into the groundwater under the site and the
surrounding land surface.
(E)
All leachate must be collected and treated by a
method (in the engineering report) approved by the
department.
(F)
For composting system using only sewage sludge
with an additive such as wood chips, the maximum
contaminant concentrations of the sewage sludge
shall meet the applicable standards in 40 CFR Part
503.
since other contaminants may be present in
the sewage sludge as indicated by discharge
monitoring and other industrial pre-treatment
requirements; the department, on a case specific
basis, may determine the maximum allowable
concentrations of these contaminants in the sewage
sludge.
(G}
Adequate drainage.
Adequate drainage to prevent
standing water and to control "run-on" and "run-
off" of rainwater shall be provided.
(3)
Operation plan.
(A}
Provide a description of the type and size of the
facility, detention times for handling and
processing the material, a process flow diagram of
the entire process, and all the major equipment
required.
Include in the report monitoring
information, such as the locations of all the
temperature monitoring points and their frequency
of reading.
(B)
Provide a detailed description of the source,
quality and quantity of the solid waste to be
composted, including the source, quality, and
expected quantity of any bulking agent to be used.
If sewage sludge is to be composted, data on the
material must be submitted.
(C)
The compost from composting operations shall be
nonpathogenic, free of offensive odors,
biologically and chemically stable, and free of
injurious components or particles, and able to
sustain plant growth.
Rejects generated by the
composting process shall be disposed of in
accordance with these rules.
58.1-95
1717
I !
§11-58.1-41
(D)
Solid waste that possess a pathogen concern, shall
be composted and meet the criteria for reducing
pathogens.
Three acceptable methods are:
(i)
Using the windrow composting method, the
solid waste is maintained under aerobic
conditions during the composting process.
A
minimum of five turnings is required during a
period of fifteen consecutive days with the
temperature of the mixture being fifty-five
degrees Celsius or greater within six to
eight inches below the surface of the pile.
(ii)
Using the perated static pile composting
method, the compost pile must be insulated
and a temperature of not less than fifty-five
degrees Celsius or greater must be maintained
throughout the compost pile for at least
three consecutive days.
(iii)
Using the enclosed vessel composting method,
the mixture must be maintained at a
temperature of not less than fifty-five
degrees Celsius or greater throughout the
mixture for at least three consecutive days.
(iv)
Other methods may be submitted to the
director and they will be approved on a case-
by-case basis.
(E)
Provide a description of the ultimate use for the
finished compost and the method of removal from
the site.
Include a plan for disposal of the
finished co~post that cannot be used •
.
(4)
Closure plan.
As part of the application for a permit,
the owner and/or operator shall develop a closure plan
to ensure no adverse environmental impa¢ts.
(c)
Reporting requirements.
At a minimum, an annual report
shall be submitted to the department, not later than thirty days
after June 30 of each year.
The report must include:
(A)
The type and quantity, by weight or volume after
primary processing, of solid waste received by the
facility.
58.1-96
1.717
(B)
{C)
§11-58.1-42
The quantity, by weight or volume, of compost
produced and removed from the facility.
A sunup.arx of monitoring done during the operation.
[Eff JAN 1 3 1994 ]
{Auth:
HRS §§342G-13,
342G-28, 342H-3, 342H-4, 342H-31)