IDAPA 58.01.01.594
Compliance Dates
For a new or reconstructed source, the owner or operator must comply with the standards in Sections 595 and 596 upon startup. Owners or operators of new sources must install dual point systems. (3-28-23)
IDAPA 58.01.01.594