35 Ill. Adm. Code 170.113
Step 3 – Submission of Project Plan
Section 170
Section 170.113 Step 3 – Submission
of Project Plan
a) Each applicant shall submit an overall project plan for each
medium. The project plan is a preliminary engineering document which defines
the scope of the total project and generally assembles basic information
including, for example, the following: preliminary project layout; assumptions
and design criteria; a discussion of how environmental regulations and
requirements will be met, including coordination of multimedia interrelationships;
and the project milestones. This plan, which provides the continuing technical
basis for the detailed design and preparation of final engineering plans and
specifications, shall contain, as a minimum, a discussion of:
1) The interrelationships among the various aspects of
environmental control;
2) Selected controls;
3) Preliminary design considerations for each medium, and for
each phase if construction or development will be phased; and
4) The timetable for project implementation for each medium.
b) The project plan shall be submitted to the Agency at any time
but no later than at the time of submission of the project permit application.
c) During the review of the project plan, the agency will resolve
conflicts arising out of specific Divisional requirements.
d) The Agency will provide a written response to the applicant
within 45 days of receipt of the project plan except that when a project plan
is submitted with the permit application, it shall be considered as part of the
application.