35 Ill. Adm. Code 215.445
Leaks: General Requirements
Section 215
Section 215.445 Leaks:
General Requirements
a) The owner or operator of a petroleum refinery shall:
1) Develop a monitoring program plan consistent with the
provisions of Section 215.446;
2) Conduct a monitoring program consistent with the provisions of
Section 215.447;
3) Conduct all tests for leaks in accordance with Method 21, 40
CFR 60, Appendix A, incorporated by reference in Section 215.105.
4) Record all leaking components which have a volatile organic
material concentration exceeding 10,000 ppm consistent with the provisions of
Section 215.448;
5) Identify each component consistent with the monitoring program
plan submitted pursuant to Section 215.446;
6) Repair and retest the leaking components as soon as possible
within 22 days after the leak is found, but no later than June 1 for the
purposes of Section 215.447(a)(1), unless the leaking components cannot be
repaired until the unit is shut down for turnaround; and
7) Report to the Agency consistent with the provisions of Section
215.449.
b) A component shall be considered to be leaking if the volatile
organic material concentration exceeds 10,000 ppm when measured at a distance
of 0 cm from the component as determined by Method 21, 40 CFR 60, Appendix A,
incorporated by reference in Section 215.105.