35 Ill. Adm. Code 218.445
Leaks: General Requirements
Section 218
Section 218.445 Leaks:
General Requirements
The owner or
operator of a petroleum refinery shall:
a) Develop a monitoring program plan consistent with the
provisions of Section 218.446;
b) Conduct a monitoring program consistent with the provisions of
Section 218.447;
c) Record all leaking components which have a volatile organic
material concentration exceeding 10,000 ppm consistent with the provisions of
Section 218.448;
d) Identify each component consistent with the monitoring program
plan submitted pursuant to Section 218.446;
e) Repair and retest the leaking components as soon as possible
within 22 days after the leak is found, but no later than June 1 for the
purposes of Section 218.447(a)(1), unless the leaking components cannot be
repaired until the unit is shut down for turnaround; and
f) Report to the Agency consistent with the provisions of Section
218.449.