35 Ill. Adm. Code 219.446

Monitoring Program Plan for Leaks

Last amended: 1993Year: 2026Length: 123 wordsOfficial source
Section 219 Section 219.446  Monitoring Program Plan for Leaks The owner or operator of a petroleum refinery shall prepare a monitoring program plan which contains, at a minimum: a)         An identification of all refinery components and the period in which each will be monitored pursuant to Section 219.447 of this Part; b)         The format for the monitoring log required by Section 219.448 of this Part; c)         A description of the monitoring equipment to be used pursuant to Section 219.447 of this Part; and d)         A description of the methods to be used to identify all pipeline valves, pressure relief valves in gaseous service and all leaking components such that they are obvious to both refinery personnel performing monitoring and Agency personnel performing inspections.
35 Ill. Adm. Code 219.446: Monitoring Program Plan for Leaks | Justis AI