35 Ill. Adm. Code 219.447
Monitoring Program for Leaks
Section 219
Section 219.447 Monitoring
Program for Leaks
a) The owner or operator of a petroleum refinery subject to
Section 219.445 of this Part shall, for the purpose of detecting leaks, conduct
a component monitoring program consistent with the following provisions:
1) Test once between March 1 and June 1 of each year, by methods
referenced in Section 219.105(g) of this Part, all pump seals, pipeline valves
in liquid service and process drains;
2) Test once each quarter of each calendar year, by methods
referenced in Section 219.105(g) of this Part, all pressure relief valves in
gaseous service, pipeline valves in gaseous service and compressor seals;
3) Inaccessible valves may be tested once each calendar year
instead of once each quarter of each calendar year;
4) Observe visually all pump seals weekly;
5) Test immediately any pump seal from which liquids are observed
dripping;
6) Test any relief valve within 24 hours after it has vented to
the atmosphere; and
7) Test immediately after repair any component that was found
leaking.
b) Storage tank valves and pressure relief devices connected to
an operating flare header or vapor recovery device are exempt from the
monitoring requirements in subsection (a) of this Section.
c) The Agency may require more frequent monitoring than would
otherwise be required by subsection (a) of this Section for components which
are demonstrated to have a history of leaking.