35 Ill. Adm. Code 219.503
Performance and Testing Requirements for Batch Operations
Section 219
Section 219.503 Performance
and Testing Requirements for Batch Operations
a) Upon the Agency's request, the owner or operator of a batch
operation shall conduct testing to demonstrate compliance with Section 219.501
of this Subpart. The owner or operator shall, at its own expense, conduct such
tests in accordance with the applicable test methods and procedures specified
in Section 219.503(d), (e), and (f) of this Subpart.
b) Notwithstanding subsection (a) of this Section, flares and
process boilers used to comply with control requirements of Section 219.501 of
this Subpart shall be exempt from performance testing requirements.
c) When a flare is used to comply with the control requirements
of Section 219.501 of this Subpart, the flare shall comply with the
requirements of 40 CFR 60.18, incorporated by reference at Section 219.112 of
this Part.
d) The owner or operator of a batch operation that is exempt from
the control requirements of Section 219.501 of this Subpart shall demonstrate,
upon the Agency's request, the absence of oversized gas moving equipment in any
manifold. Gas moving equipment shall be considered oversized if it exceeds the
maximum requirements of the exhaust flow rate by more than 30 percent.
e) For the purpose of demonstrating compliance with the control
requirements in Section 219.501 of this Subpart, the batch operation shall be
run at representative operating conditions and flow rates during any
performance test.
f) The following methods in 40 CFR 60, Appendix A, incorporated
by reference at Section 219.112 of this Part, shall be used to demonstrate compliance
with the reduction efficiency requirement set forth in Section 219.501 of this
Subpart:
1) Method 1 or 1A, as appropriate, for selection of the sampling
sites if the flow measuring device is not a rotameter. The control device
inlet sampling site for determination of vent stream VOM composition reduction
efficiency shall be prior to the control device and after the control device;
2) Method 2, 2A, 2C, or 2D, as appropriate, for determination of
gas stream volumetric flow rate flow measurements, which shall be taken
continuously. No traverse is necessary when the flow measuring device is an
ultrasonic probe;
3) Method 25A or Method 18, if applicable, to determine the
concentration of VOM in the control device inlet and outlet;
A) The sampling time for each run shall be as follows:
i) For batch cycles less than eight hours in length, readings
shall be taken continuously over the entire length of the batch cycle with a
maximum of 15-minute intervals between measurements if using Method 25A. If
using Method 18, readings shall be taken continuously with a maximum of
15-minute intervals between measurements throughout the batch cycle unless it
becomes necessary to change the impinger train, in which case a 30-minute
interval shall not be exceeded.
ii) For batch cycles of eight hours and greater in length, the
owner or operator may either test in accordance with the test procedures
defined in subsection (f)(3)(A)(i) of this Section or the owner or operator may
elect to perform tests, pursuant to either Method 25A or Method 18, only during
those portions of each emission event which define the emission profile of each
emission event occurring within the batch cycle. For each emission event of
less than four hours in duration, the owner or operator shall test continuously
over the entire emission event as set forth in subsection (f)(3)(A)(i) of this
Section. For each emission event of greater than four hours in duration, the
owner or operator shall elect either to perform a minimum of three one hour
test runs during the emission event or shall test continuously over the entire
emission event within each single unit operation in the batch process train. To
demonstrate that the portion of the emission event to be tested defines the
emission profile for the emission event, the owner or operator electing to rely
on this option shall develop an emission profile for the entire emission event.
Such emission profile shall be based upon either process knowledge or test data
collected. Examples of information that could constitute process knowledge
include, but are not limited to, calculations based on material balances and
process stoichiometry. Previous test results may be used provided such results
are still relevant to the current process vent stream conditions.
iii) For purposes of subsection (f)(3) of this Section, the term
"emission event" shall be defined as a discrete period of venting
that is associated with a single unit operation. For example, a displacement
of vapor resulting from the charging of a single unit operation with VOM will
result in a discrete emission event that will last through the duration of the
charge and will have an average flow rate equal to the rate of the charge. The
expulsion of expanded single unit operation vapor space when the vessel is
heated is also an emission event. Both of these examples of emission events
and others may occur in the same single unit operation during the course of the
batch cycle. If the flow rate measurement for any emission event is zero, in
accordance with subsection (f)(2) of this Section, then such event is not an
emission event for purposes of this Section.
B) The mass emission rate from the process vent or inlet to the
control device shall be determined by combining concentration and flow rate
measurements taken simultaneously at sampling sites selected in accordance with
subsection (f)(1) of this Section throughout the batch cycle;
C) The mass emission rate from the control device outlet shall be
obtained by combining concentration and flow rate measurements taken
simultaneously at sampling sites selected in accordance with subsection (f)(1)
of this Section throughout the batch cycle; and
D) The efficiency of the control device shall be determined by
integrating the mass emission rates obtained in subsections (f)(3)(B) and
(f)(3)(C) of this Section, over the time of the batch cycle and dividing the
difference in inlet and outlet mass flow totals by the inlet mass flow total.
g) Upon request by the Agency to conduct testing, an owner or
operator of a batch operation which has installed a scrubber, a shell and tube
condenser using a non-refrigerated cooling media, or any other control device
which meets the criteria of Section 219.501(c) of this Subpart, shall
demonstrate that such device achieves the control efficiency applicable within
Section 219.501 of this Subpart upon the earlier to occur of the date the
device is replaced or December 31, 1999.
h) The owner or operator of a batch operation may propose an
alternative test method or procedures to demonstrate compliance with the
control requirements set forth in Section 219.501 of this Subpart. Such method
or procedures shall be approved by the Agency and USEPA as evidenced by
federally enforceable permit conditions.
i) In the absence of a request by the Agency to conduct
performance testing in accordance with the provisions of this Section, a source
may demonstrate compliance by the use of engineering estimates or process
stoichiometry.