35 Ill. Adm. Code 225.235
Units Scheduled for Permanent Shut Down
Section 225.235 Units Scheduled for Permanent Shut Down
a) The
emission standards of Section 225.230(a) are not applicable to an EGU that will
be permanently shut down as described in this Section:
1) The
owner or operator of an EGU that relies on this Section must complete the
following actions before June 30, 2009:
A) Have
notified the Agency that it is planning to permanently shut down the EGU by the
applicable date specified in subsection (a)(3) or (4) of this Section. This
notification must include a description of the actions that have already been
taken to allow the shut down of the EGU and a description of the future actions
that must be accomplished to complete the shut down of the EGU, with the
anticipated schedule for those actions and the anticipated date of permanent
shut down of the unit.
B) Have
applied for a construction permit or be actively pursuing a federally
enforceable agreement that requires the EGU to be permanently shut down in
accordance with this Section.
C) Have
applied for revisions to the operating permits for the EGU to include
provisions that terminate the authorization to operate the unit in accordance
with this Section.
2) The
owner or operator of an EGU that relies on this Section must, before June 30,
2010, complete the following actions:
A) Have
obtained a construction permit or entered into a federally enforceable
agreement as described in subsection (a)(1)(B) of this Section; or
B) Have
obtained revised operating permits in accordance with subsection (a)(1)(C) of
this Section.
3) The
plan for permanent shut down of the EGU must provide for the EGU to be
permanently shut down by no later than the applicable date specified below:
A) If the
owner or operator of the EGU is not constructing a new EGU or other generating
unit to specifically replace the existing EGU, by December 31, 2010.
B) If the
owner or operator of the EGU is constructing a new EGU or other generating unit
to specifically replace the existing EGU, by December 31, 2011.
4) The
owner or operator of the EGU must permanently shut down the EGU by the date
specified in subsection (a)(3) of this Section, unless the owner or operator
submits a demonstration to the Agency before the specified date showing that
circumstances beyond its reasonable control (such as protracted delays in
construction activity, unanticipated outage of another EGU, or protracted
shakedown of a replacement unit) have occurred that interfere with the plan for
permanent shut down of the EGU, in which case the Agency may accept the
demonstration as substantiated and extend the date for shut down of the EGU as
follows:
A) If the
owner or operator of the EGU is not constructing a new EGU or other generating
unit to specifically replace the existing EGU, for up to one year, i.e.,
permanent shut down of the EGU to occur by no later than December 31, 2011; or
B) If the
owner or operator of the EGU is constructing a new EGU or other generating unit
to specifically replace the existing EGU, for up to 18 months, i.e., permanent
shutdown of the EGU to occur by no later than June 30, 2013; provided, however,
that after December 31, 2012, the existing EGU must only operate as a back-up
unit to address periods when the new generating units are not in service.
b) Notwithstanding
Sections 225.230 and 225.232, any EGU that is not required to comply with
Section 225.230 pursuant to this Section must not be included when determining
whether any other EGUs at the source or other sources are in compliance with
Section 225.230.
c) If an
EGU, for which the owner or operator of the source has relied upon this Section
in lieu of complying with Section 225.230(a) is not permanently shut down as
required by this Section, the EGU must be considered to be a new EGU subject to
the emission standards in Section 225.237(a) beginning in the month after the
EGU was required to be permanently shut down, in addition to any other
penalties that may be imposed for failure to permanently shut down the EGU in
accordance with this Section.
d) An
EGU that has completed the requirements of subsection (a) of this Section is
exempt from the monitoring and testing requirements in Sections 225.239 and
225.240.
e) An
EGU that is scheduled for permanent shut down pursuant to Section 225.294(b) is
exempt from the monitoring and testing requirements in Sections 225.239 and 225.240.