35 Ill. Adm. Code 225.265
Coal Analysis for Input Mercury Levels
Section 225.265 Coal Analysis for Input Mercury Levels
a) The
owner or operator of an EGU complying with this Subpart B by means of Section
225.230(a)(1)(B); using input mercury levels (I
i
) and complying by
means of Section 225.230(b) or (d) or Section 225.232; electing to comply with
the emissions testing, monitoring, and recordkeeping requirements under Section
225.239; demonstrating compliance under Section 225.233, except an EGU in an
MPS Group that elects to comply with the emission standard in Section
225.233(d)(1)(A) or (d)(2)(A); or demonstrating compliance under Sections
225.291 through 225.299, except an EGU in a CPS Group that elects to comply
with the emission standard in Section 225.294(c)(1) or that opts into the
emission standard in Section 225.294(c)(1) pursuant to Section 225.294(e)(1) or
that has permanently ceased combusting coal must fulfill the following
requirements:
1) Perform
sampling of the coal combusted in the EGU for mercury content. The owner or
operator of such EGU must collect a minimum of one 2-lb. grab sample from the
belt feeders anywhere between the crusher house or breaker building and the
boiler or, in cases in which a crusher house or breaker building is not
present, at a reasonable point close to the boiler of a subject EGU, according
to the schedule in subsections (a)(1)(A) through (C). The sample must be taken
in a manner that provides a representative mercury content for the coal burned
on that day. If multiple samples are tested, the owner or operator must
average those tests to arrive at the final mercury content for that time
period. The owner or operator of the EGU must perform coal sampling as
follows:
A) EGUs
complying by means of Section 225.233, except an EGU in an MPS Group that
elects to comply with the control efficiency standard in Section
225.233(d)(1)(B) or (d)(2)(B) or elects to comply with Section 225.233(d)(4),
or Sections 225.291 through 225.299, except an EGU in a CPS Group that elects
to comply with the control efficiency standard in Section 225.294(c)(2) or that
opts into the emission standard in Section 225.294(c)(2) pursuant to Section
225.294(e)(1) must perform such coal sampling at least once per month unless
the boiler did not operate or combust coal at all during that month;
B) EGUs
complying by means of the emissions testing, monitoring, and recordkeeping
requirements under Section 225.239 or Section 225.233(d)(4), or EGUs that opt
into the emission standard in Section 225.294(c)(2) pursuant to Section
225.294(e)(1)(B), must perform such coal sampling according to the schedule
provided in Section 225.239(e)(3) of this Subpart;
C) All
other EGUs subject to this requirement, including EGUs in an MPS or CPS Group
electing to comply with the control efficiency standard in Section 225.233(d)(1)(B)
or (d)(2)(B), Section 225.294(c)(2), or Section 225.294(c)(2) pursuant to
Section 225.294(e)(1)(A), must perform such coal sampling on a daily basis when
the boiler is operating and combusting coal.
2) Analyze
the grab coal sample for the following:
A) Determine
the heat content using ASTM D5865-04 or an equivalent method approved in
writing by the Agency.
B) Determine
the moisture content using ASTM D3173-03 or an equivalent method approved in
writing by the Agency.
C) Measure
the mercury content using ASTM D6414-01, ASTM D3684-01, ASTM D6722-01, or an equivalent
method approved in writing by the Agency.
3) The
owner or operator of multiple EGUs at the same source using the same crusher
house or breaker building may take one sample per crusher house or breaker
building, rather than one per EGU.
4) The
owner or operator of an EGU must use the data analyzed pursuant to subsection
(b) of this Section to determine the mercury content in terms of parts per
million.
b) The
owner or operator of an EGU that must conduct sampling and analysis of coal
pursuant to subsection (a) of this Section must begin such activity by the
following date:
1) If
the EGU is in daily service, at least 30 days before the start of the month for
which such activity will be required.
2) If
the EGU is not in daily service, on the day that the EGU resumes operation.