35 Ill. Adm. Code 225.560
Energy Efficiency and Conservation, Renewable Energy, and Clean
Section
225.560 Energy Efficiency and Conservation, Renewable Energy, and Clean
Technology
Projects
a) Energy efficiency and
conservation projects means any of the following projects implemented and
located in Illinois:
1) Demand side management
projects that reduce the overall power demand by using less energy include:
A) Smart building management
software that more efficiently regulates power flows.
B) The use of or replacement
to high efficiency motors, pumps, compressors, or steam systems.
C) Lighting
retrofits.
2) Energy efficient new
building construction projects include:
A) ENERGY
STAR-qualified new home projects.
B) Measures to reduce or
conserve energy consumption beyond the requirements of the Illinois Energy
Conservation Code for Commercial Buildings [20 ILCS 687/6-3].
C) New residential
construction projects that qualify for Energy Efficient Tax Incentives pursuant
to the Energy Policy Act of 2005 (42 USC 15801 (2005)).
3) Supply-side energy
efficiency projects include projects implemented to improve the efficiency in
electricity generation by coal-fired power plants and the efficiency of
electrical transmission and distribution systems.
4) Highly efficient power
generation projects, such as, but not limited to, combined cycle projects,
combined heat and power, and microturbines. To be considered a highly
efficient power generation project pursuant to this subsection (a)(4), a
project must meet the following applicable thresholds and criteria:
A) For combined heat and
power projects generating both electricity and useful thermal energy for space,
water, or industrial process heat, a rated-energy efficiency of at least 60
percent: the project shall not be a CAIR NO
x
Ozone Season unit.
B) For combined cycle
projects rated at greater than 0.50 MW, a rated-energy efficiency of at least
50 percent.
C) For microturbine projects
rated at or below 0.50 MW and all other projects a rated-energy efficiency of
at least 40 percent.
b) Renewable energy project
means any of the following projects implemented and located in Illinois:
1) Zero-emission electric
generating projects, including wind, solar (thermal or photovoltaic), and
hydropower projects. Eligible hydropower plants are restricted to new
generators that are not replacements of existing generators, that commenced
operation on or after January 1, 2006, and that do not involve the significant
expansion of an existing dam or the construction of a new dam.
2) Renewable energy units
are those units that generate electricity using more than 50 percent of the
heat input, on an annual basis, from dedicated crops grown for energy
production or the capture systems for methane gas from landfills, water
treatment plants or sewage treatment plants, and organic waste biomass, and
other similar sources of non-fossil fuel energy. Renewable energy projects do
not include energy from incineration by burning or heating of waste wood, tires,
garbage, general household waste, institutional lunchroom waste, office waste,
landscape waste, or construction or demolition debris.
c) Clean technology projects
for reducing emissions from producing electricity and useful thermal energy
means any of the following projects implemented and located in Illinois:
1) Air pollution control
equipment upgrades for control of NO
x
emissions at existing
coal-fired EGUs, as follows: installation of a selective catalytic reduction
(SCR) or selective non-catalytic reduction (SNCR) system, or other emission
control technologies. For this purpose, a unit will be considered
"existing" after it has been in commercial operation for at least
eight years. Air pollution control upgrades do not include the addition of low
NO
x
burners, overfired air techniques, gas reburning techniques,
flue gas conditioning techniques for the control of NO
x
emissions,
projects involving upgrades or replacement of electrostatic precipitators, or
addition of an activated carbon injection, or other sorbent injection for
control of mercury.
2) Clean coal technologies
projects include:
A) Integrated gasification
combined cycle (IGCC) plants.
B) Fluidized bed coal
combustion that commenced operation prior to December 31, 2006.
d) In addition to those
projects excluded in subsections (a) through (c) of this Section, the following
projects are also not energy efficiency and conservation, renewable energy, or
clean technology projects:
1) Nuclear power projects.
2) Projects required to
meet emission standards or technology requirements under State or federal law
or regulation, except that allowances may be allocated for projects undertaken
pursuant to Section 225.233 or Subpart F.
3) Projects used to meet
the requirements of a court order or consent decree, except that allowances may
be allocated for:
A) Emission rates or limits
achieved that are lower than what is required to meet the emission rates or
limits for SO
2
or NO
x
, or for installing a baghouse as
provided for in a court order or consent decree entered into before May 30,
2006.
B) Projects used to meet the
requirements of a court order or consent decree entered into on or after May
30, 2006, if the court order or consent decree does not specifically preclude
such allocations.
4) A Supplemental
Environmental Project (SEP).
e) Applications for
projects implemented and located in Illinois that are not specifically listed
in subsections (a) through (c) of this Section, and that are not specifically
excluded by definition in subsections (a) through (c) of this Section or by
specific exclusion in subsection (d) of this Section, may be submitted to the
Agency. The application must designate which category or categories from those
listed in subsections (a)(1) through (c)(2)(B) of this Section best fit the
proposed project and the applicable formula pursuant to Section 225.565(b) to
calculate the number of allowances that it is requesting. The Agency will
determine whether the application is approvable based on a sufficient
demonstration by the project sponsor that the project is a new type of energy
efficiency, renewable energy, or clean technology project, similar in its
effects as the projects specifically listed in subsections (a) through (c) of
this Section.
f) Early adopter projects
include projects that meet the criteria for any energy efficiency and
conservation, renewable energy, or clean technology projects listed in
subsections (a) , (b), (c), and (e) of this Section and commence construction
between July 1, 2006 and December 31, 2012.