35 Ill. Adm. Code 225.565
Clean Air Set-Aside (CASA) Allowances
Section
225.565 Clean Air Set-Aside (CASA) Allowances
a) The CAIR NO
x
Ozone
Season allowances for the CASA for each control period will be assigned to the
following categories of projects:
Phase I
Phase II
(2009-2014)
(2015 and thereafter)
1)
Energy
Efficiency and Conservation/Renewable Energy
3684
3479
2)
Air
Pollution Control Equipment Upgrades
1535
1448
3)
Clean
Coal Technology Projects
1842
1738
4)
Early
Adopters
614
580
b) The following formulas
must be used to determine the number of CASA allowances that may be allocated
to a project per control period:
1) For an energy efficiency
and conservation project pursuant to Section 225.560(a)(1) through (a)(4)(A),
the number of allowances must be calculated using the number of megawatt hours
of electricity that was not consumed during a control period and the following
formula:
A
=
(MWh
c
)
´
(1.5 lb/MWh) / 2000 lb
Where:
A
=
The
number of allowances for a particular project.
MWh
c
=
The
number of megawatt hours of electricity conserved or generated during a
control period by a project.
2) For a zero emission
electric generating project pursuant to Section 225.560(b)(1), the number of
allowances must be calculated using the number of megawatt hours of electricity
generated during a control period and the following formula:
A
=
(MWh
g
)
´
(2.0 lb/MWh) / 2000 lb
Where:
A
=
The
number of allowances for a particular project
MWh
g
=
The
number of megawatt hours of electricity generated during a control period by
a project.
3) For a renewable energy
emission unit pursuant to Section 225.560(b)(2), the number of allowances must
be calculated using the number of megawatt hours of electricity generated
during a control period and the following formula:
A
=
(MWh
g
)
´
(0.5 lb/MWh) / 2000 lb
Where:
A
=
The
number of allowances for a particular project.
MWh
g
=
The
number of MW hours of electricity generated during a control period by a
project.
4) For an air pollution
control equipment upgrade project pursuant to Section 225.560(c)(1), the number
of allowances must be calculated using the emission rate before and after
replacement or improvement, and the following formula:
A
=
(MWh
g
)
´
0.10
´
(ER
B
lb/MWh - ER
A
lb/MWh) / 2000 lb
Where:
A
=
The
number of allowances for a particular project.
MWh
g
=
The
number of MWhs of electricity generated during a control period by a project.
ER
B
=
Average
NO
x
emission rate based on CEMS data from the most recent two
control periods prior to the replacement or improvement of the control
equipment in lb/MWh, unless subject to a consent decree or court order. For
units subject to a consent decree or court order entered into before May 30, 2006,
ER
B
is limited to emission rates or limits that are lower than the
emission rate or limit required in the consent decree
or
court order. On or after May 30, 2006, ER
B
is limited to emission
rates or limits specified in the consent decree or court order. If such
limit is not expressed in lb/MWh, the limit shall be converted into lb/MWh
using a heat rate of 10 mmBtu/1 MW.
ER
A
=
Average
NO
x
emission rate for the applicable control period data based on
CEMS data in lb/MWh.
5) For highly efficient
power generation and clean coal technology projects:
A) For projects other than
fluidized coal combustion pursuant to Section 225.560(a)(4)(B), (a)(4)(C), and
(c)(2), the number of allowances must be calculated using the number of MWh of
electricity the project generates during a control period and the following
formula:
A
=
(MWh
g
)
´
(1.0 lb/MWh - ER lb/MWh) / 2000 lb
Where:
A
=
The
number of allowances for a particular project.
MWh
g
=
The
number of megawatt hours of electricity generated during a control period by
a project.
ER
=
Annual
average NO
x
emission rate based on CEMS data in 1b/MWh.
B) For fluidized bed coal
combustion projects pursuant to Section 225.560(c)(2), the number of allowances
shall be calculated using the number of gross MWh of electricity the project
generates during a control period and the following formula:
A
=
(MWh
g
)
´
(1.4 lb/MWh - ER lb/MWh) / 2000 lb
Where:
A
=
The
number of allowances for a particular project.
MWh
g
=
The
number of gross MWh of electricity generated during a control period by a
project.
ER
=
Annual NO
x
emission
rate for the control period based on CEMS data in lb/MWh.
6) For a CASA project that
commences construction before December 31, 2012, in addition to the allowances
allocated pursuant to subsections (b)(1) through (b)(5) of this Section, a
project sponsor may also request additional allowances under the early adopter
project category pursuant to Section 225.560(e) based on the following formula:
A
=
1.0
+ 0.10
´
Σ A
i
Where:
A
=
The
number of allowances for a particular project as determined in subsections
(b)(1) through (b)(5) of this Section.
A
i
=
The
number of allowances as determined in subsection (b)(1), (b)(2), (b)(3),
(b)(4) or (b)(5) of this Section for a given project.