35 Ill. Adm. Code 370.211

Design Flows

Last amended: 1997Year: 2026Length: 144 wordsOfficial source
Section 370 Section 370.211  Design Flows The following flows shall be identified in the basis of design for sewers, lift stations, sewage treatment plants, treatment units and other wastewater handling facilities. a)         Design Average Flow The design average flow is the average of the daily volumes to be received for a continuous 12-month period of the design year, expressed as a volume per unit of time. b)         Design Maximum Flow The design maximum flow is the largest volume of flow to be received during a continuous 24-hour period, expressed as a volume per unit of time. c)         Design Peak Hourly Flow The design peak hourly flow is the largest volume of flow to be received during a one hour period,  expressed as a volume per unit of time. d)         Design Peak Flow The design peak flow is the instantaneous maximum flowrate to be received.
35 Ill. Adm. Code 370.211: Design Flows | Justis AI