35 Ill. Adm. Code 370.450
Emergency Operation
Section 370
Section 370.450 Emergency
Operation
a) Objective
The objective of emergency operation is to prevent the
discharge of raw or partially treated sewage to any waters and to protect
public health by preventing back-up of sewage and subsequent discharge to
basements, streets, and other public and private property.
b) Emergency Pumping Capability
Provision of emergency pumping capability is mandatory and
may be accomplished by connection of the station to at least two independent
utility substations, or by provision of portable or in-place internal combustion
engine equipment which will generate electrical or mechanical energy, or by the
provision of portable pumping equipment. Emergency standby systems shall have
sufficient capacity to start up and maintain the total rated running capacity
of the station. Regardless of the type of emergency standby system provided, a
riser from the force main with rapid connection capabilities and appropriate
valving shall be provided for all lift stations to hook up portable pumps.
c) Emergency High Level Overflows
For use during possible periods of extensive power outages,
mandatory power reductions, or uncontrollable emergency conditions,
consideration should be given to providing a controlled, high-level wet well
overflow to supplement alarm systems and emergency power generation in order to
prevent backup of sewage into basements, or other discharges which may cause
severe adverse impacts on public interests, including public health and
property damage. Where a high level overflow is utilized, consideration shall
also be given to the installation of storage/detention tanks, or basins, which
shall be made to drain to the station wet well. Where such overflows affect
public water supplies or waters used for culinary or food processing purposes,
a storage detention basin, or tank, shall be provided having 2-hour detention
capacity at the anticipated overflow rate.
d) Equipment Requirements
1) General
The following general requirements shall apply to all
internal combustion engines used to drive auxiliary pumps, service pumps
through special drives, or electrical generating equipment:
A) Engine Protection
The engine must be protected from operating conditions that
would result in damage to equipment. Unless continuous manual supervision is
planned, protective equipment shall be capable of shutting down the engine and
activating an alarm on site and as provided in Section 370.135. Protective
equipment shall monitor for conditions of low oil pressure and overheating,
except that oil pressure monitoring will not be required for engines with
splash lubrication.
B) Size
The engine shall have adequate rated power to start and
continuously operate all connected loads.
C) Fuel Type
Reliability and ease of starting, especially during cold
weather conditions, should be considered in the selection of the type of fuel.
D) Engine Ventilation
The engine shall be located above grade with adequate
ventilation of fuel vapors and exhaust gases.
E) Routine Start-up
All emergency equipment shall be provided with instructions
indicating the need for regular starting and running of such units at full
loads.
F) Protection of Equipment
Emergency equipment shall be protected from damage at the
restoration of regular electrical power.
2) Engine - Drive Pumping Equipment
Where permanently-installed or portable engine-driven pumps
are used, the following requirements in addition to general requirements shall
apply:
A) Pumping Capacity
Engine-drive pumps shall meet the design pumping requirements
unless storage capacity is available for flows in excess of pump capacity.
Pumps shall be designed for anticipated operating conditions, including suction
lift if applicable.
B) Operation
The engine and pump shall be equipped to provide automatic
start-up and operation of pumping equipment unless manual start-up and
operation is justified. Provisions shall also be made for manual start-up.
Where manual start-up and operation is justified, storage capacity and alarm
system must meet the requirements of subsection (d)(2)(C).
C) Portable Pumping Equipment
Where part or all of the engine-driven pumping equipment is
portable, sufficient storage capacity shall be provided to allow time for
detection of pump station failure and transportation and hookup of the portable
equipment.
3) Engine-Driven Generating Equipment
Where permanently-installed or portable engine-driven
generating equipment is used, the following requirements shall apply in
addition to general requirements of subsection (d)(1):
A) Generating Capacity
i) Generating unit size shall be adequate to provide power for
pump motor starting current and for lighting, ventilation, and other auxiliary
equipment necessary for safety and proper operation of the lift station.
ii) The operation of only one pump during periods of auxiliary
power supply must be justified. Such justification may be made on the basis of
the design peak flows relative to single-pump capacity, anticipated length of
power outage, and storage capacity.
iii) Special sequencing controls shall be provided to start pump
motors unless the generating equipment has capacity to start all pumps
simultaneously with auxiliary equipment operating.
B) Operation
Provisions shall be made for automatic and manual start-up
and load transfer unless only manual start-up and operation is justified. The
generator must be protected from operating conditions that would result in
damage to equipment. Provisions should be considered to allow the engine to
start and stabilize at operating speed before assuming the load. Where manual
start-up and transfer is justified, storage capacity and alarm system must meet
the requirements of subsection (d)(3)(C).
C) Portable Generating Equipment
Where portable generating equipment or manual transfer is
provided, sufficient storage capacity shall be provided to allow time for
detection of pump station failure and transportation and connection of
generating equipment. The use of special electrical connections and double
throw switches are recommended for connecting portable generating equipment.
4) Independent Utility Substations
Where independent substations are used for emergency power,
each separate substation and its associated transmission lines must be capable
of starting and operating the pump station at its rated capacity.