35 Ill. Adm. Code 370.520
Design
Section 370
Section 370.520 Design
a) Type of Treatment
1) As a minimum, the following items shall be considered in the
selection of the type of treatment:
A) Present and future effluent requirements.
B) Location and local topography of the plant site.
C) The effects of industrial wastes likely to be encountered.
D) Ultimate disposal of sludge.
E) System capital costs.
F) System operating and maintenance costs and basic energy
requirements.
G) Existing unit process performance and capacity.
H) Process complexity governing operating personnel requirements.
I) Environmental impact on present and future adjacent land use.
2) The plant design shall provide the necessary flexibility to
perform satisfactorily within the expected range of waste characteristics and
volumes.
b) Required Engineering Data for New Process Evaluation
1) The policy of the Agency is to encourage rather than obstruct
the development of any methods or equipment for treatment of wastewaters. The
lack of inclusion in these standards of some types of wastewater treatment
processes or equipment should not be construed as precluding their use. The
Agency may approve other types of wastewater treatment processes and equipment
under the condition that the operational reliability and effectiveness of the
process or device shall have been demonstrated with a suitably-sized prototype
unit operating at its design load conditions, to the extent required.
2) To determine that such new processes and equipment have a
reasonable and substantial chance of success, the Agency will require the
following:
A) Monitoring observations, including test results and engineering
evaluations, demonstrating the efficiency of such processes.
B) Detailed description of the test methods.
C) Testing, including appropriately-composited samples, under
various ranges of strength and flow rates (including diurnal variations) and
waste temperatures over a sufficient length of time to demonstrate performance
under climatic and other conditions which may be encountered in the area of the
proposed installations.
D) Other appropriate information.
3) The Agency will require that appropriate testing be conducted
and evaluations be made under the supervision of a competent process engineer
other than those employed by the manufacturer or developer.
c) Design Loads
1) Hydraulic Design
A) New Systems
Plans for sewage treatment plants to serve new sewer systems
for municipalities or sewer districts shall be based upon a design average
daily flow of at least 100 gallons per capita, to which must be added
industrial waste volumes. The design also shall include appropriate allowance
for flow conditions determined under Section 370.122.
B) Existing Systems
Where there is an existing sewer system, the volume and rates
of the existing sewage flows shall be determined. The determination shall
include both dry weather and wet weather flows. At least one year's flow data
should be used to determine the design flows that are defined in Section
370.220.
C) Treatment Plant Design Capacity
The treatment plant capacity shall be rated on the design
average flow, selected after any sewer system rehabilitation, plus appropriate
future growth. The design of treatment units that are not subject to peak flow
requirements shall be based on the design average flow. For plants subject to
high wet weather flows or overflow detention pumpback flows, the design maximum
flow that the plant is to treat on a sustained basis must be specified.
2) Organic Design
A) New Systems Minimum Design
i) Domestic waste treatment design shall be on the basis of at
least 0.17 pounds of biochemical oxygen demand (BOD5) per capita per day and
0.20 pounds of suspended solids per capita per day.
ii) When garbage grinders are used in areas tributary to a
domestic treatment plant, the design basis should be increased to 0.22 pounds
of BOD5 and 0.25 pounds of suspended solids per capita per day.
iii) Domestic waste treatment plants that will receive industrial
wastewater flows shall be designed to include these industrial waste loads.
B) Existing Systems
When an existing treatment works is to be upgraded or
expanded, organic design shall be based upon the actual strength of the
wastewater as determined from measurements taken in accordance with subsection
(c)(1)(B), with an appropriate increment for growth as determined under the
provisions of subsection (c)(2)(A).
3) Shock Effects
Domestic waste treatment designs shall consider and take into
account the shock effect of high concentrations and diurnal peaks for short
periods on the treatment process, particularly for small waste treatment plants
serving institutions, restaurants, schools, etc.
4) Design by Analogy
Data from similar existing systems may be utilized in the
case of new systems; however, thorough investigation and adequate documentation
shall be made to establish the reliability and applicability of such data.
d) Conduits
1) All piping and channels shall be designed to carry the maximum
expected flows. The incoming sewer shall be designed for unrestricted flow.
Bottom corners of the channels must be filleted. Conduits shall be designed to
avoid creation of pockets and corners where solids can accumulate.
2) Suitable gates should be placed in channels to seal off unused
sections which might accumulate solids. The use of shear gates is permitted
where they can be used in place of gate valves or sluice gates. Non-corrodible
materials shall be used for these control gates.
e) Arrangement of Units
Component parts of the plant should be arranged for greatest
operating convenience, flexibility, economy, continuity of maximum effluent
quality, and so as to facilitate installation of future units.
f) Flow Division Control
Flow division control facilities shall be provided as
necessary to insure organic and hydraulic loading control to plant process
units and shall be designed for easy operator access, change, observation, and
maintenance. The use of head boxes equipped with sharp-crested weirs or
similar devices are recommended. The use of valves for flow splitting is not
acceptable. Appropriate flow measurement shall be incorporated in the flow
division control design.
g) Load Equalization and Attenuation
1) Equalization of hydraulic and organic loads to downstream
treatment units is recommended where the peak hourly load exceeds 300% of the
design average load. Particular attention shall be given to equalization of
pumped flows to limit hydraulic surges on downstream units.
2) Plants proposed to receive sewage wastes from only
institutions (motels, schools, hospitals, nursing homes, etc.) or industries
which discharge substantially the total flow in 12 hours or less, shall be
designed to include flow equalization. Where flow equalization facilities are
provided, the design shall include adequate aeration and mixing equipment to
prevent septicity.